Asbestos Requirements for Demolition and Renovation Projects 6/2013 Disclaimer: The statements in this How To Remove Asbestos From A Roof document are intended solely as guidance. This document is not intended, nor can it be relied on, to create any rights enforceable by any party in litigation.  

This How To Remove Asbestos From A Roof guidance may be revised without public notice to reflect changes in law, regulation or policy. Introduction This document is one in a series of fact sheets designed to assist you in becoming aware of the Department of Natural Resources' asbestos requirements. 

This particular document contains information regarding how to determine if your demolition or renovation project is regulated by the department's air pollution control requirements. It will also help to explain the basic How To Remove Asbestos From A Roof requirements for asbestos inspection, asbestos abatement, and for notification of regulated demolition and renovation projects. 

Asbestos waste disposal requirements are also discussed. Determining if Your Project Will Involve Regulated Structures The first step in determining if your demolition or How To Remove Asbestos From A Roof renovation project is regulated is to determine the type of structure that will be affected. 

The department regulates demolition and renovation projects involving institutional, commercial, public, industrial, or residential structures, installations or buildings. An exception to this regulation is for a single residential structure that contains four dwelling units or less. Projects that involve two or more residential How To Remove Asbestos From A Roof structures are not exempt. 

If the structure has been used for any purpose other than residential, such as being converted from residential to commercial use or converted from commercial to residential use, it is not exempt. Any residential How To Remove Asbestos From A Roof structure used in fire training exercises is not exempt. 

Should a regulated structure be demolished by a catastrophic event, such as a tornado or accidental fire, the department's Air Pollution Control Program should be contacted for guidance. Inspection Requirements Prior to demolition or renovation activities, regulated structures or those areas that will be subject to How To Remove Asbestos From A Roof demolition.

Renovation activities must be thoroughly inspected by a Missouri certified asbestos inspector to determine if any asbestos-containing materials are present. The inspector should identify all potential asbestos-containing (suspect) materials that may be disturbed by the demolition or How To Remove Asbestos From A Roof renovation activity. 

Samples of the suspect materials should be collected and submitted for laboratory analysis to determine if they contain asbestos. The inspector should generate a report of his or her findings from the inspection. The report should identify all How To Remove Asbestos From A Roof suspect materials present, and indicate the amount, location, category and condition of the suspect materials. 

The report should also include a copy of the analytical results and chain of custody for all samples collected. If a regulated structure is structurally unsound, it may not be possible to thoroughly inspect the entire structure. An inspection should be performed in all areas of the How To Remove Asbestos From A Roof structure where it is safe to do so. 

The final inspection report should clearly indicate what areas, if any, were not inspected. Areas of the building that were not inspected will require special handling during How To Remove Asbestos From A Roof demolition. A list of Missouri certified asbestos inspectors is available on the department's website. 

Categories of Asbestos-Containing Materials There are three categories of asbestos-containing materials that may be identified by an inspector. Friable asbestos-containing material - Any How To Remove Asbestos From A Roof material containing more than one percent asbestos that, when dry, can be crumbled, pulverized or reduced to powder by hand pressure. 

Examples include sprayed or troweled-on How To Remove Asbestos From A Roof materials such as acoustical ceiling spray or boiler insulation, paper pipe  insulation and drop-in ceiling tile. Category I nonfriable asbestos-containing material - Asbestos-containing packings, gaskets, resilient  floor covering and asphalt roofing products containing more than one percent asbestos. 

(Any asbestos-containing vapor barrier on resilient floor coverings such as sheet vinyl or tile is considered friable asbestos.) Category II nonfriable asbestos-containing How To Remove Asbestos From A Roof material - Any nonfriable material, other than Category I materials, containing more than one percent asbestos. Examples of Category II materials  include asbestos cement wall or roof shingles and cement pipe. 

Depending on the type or category of the asbestos-containing materials identified from the inspection How To Remove Asbestos From A Roof and the forces that will eventually act upon them during demolition and renovation, the materials may or may not be regulated by the department's asbestos requirements. 

To determine the How To Remove Asbestos From A Roof applicability of the department's asbestos requirements, you must determine if the asbestos from your project will meet the definition of regulated asbestos-containing material, or RACM. RACM includes friable asbestos-containing materials.

Category I nonfriable materials that have become or will become friable, or have been subject to sanding, grinding, cutting, burning, or abrading; or Category II nonfriable materials that have a high probability of becoming, or have become, crumbled, pulverized or reduced to powder by the work practices used during the course of demolition or How To Remove Asbestos From A Roof renovation. 

Requirements for Abatement of Regulated Asbestos-Containing Material If the asbestos inspection determines 160 square feet, 260 linear feet, 35 cubic feet (threshold quantities), or more of RACM will be impacted by demolition or How To Remove Asbestos From A Roof renovation activities, all of the RACM must be removed by a Missouri registered asbestos abatement contractor. 

Abatement contractors are trained in the proper procedures for safely removing and disposing of asbestos-containing material and may only employ workers trained How To Remove Asbestos From A Roof and subsequently, certified by the department to participate on a regulated project. A list of Missouri registered asbestos abatement contractors is available on the department's website. 

If a building is structurally unsound and unsafe to enter, there may be provisions that would allow the building to be demolished without being inspected or having the RACM removed. In this event contact the Air Pollution Control Program. Requirements for How To Remove Asbestos From A Roof Abatement of Nonfriable Asbestos-Containing Materials. 

Most nonfriable materials are not considered RACM unless they are in poor condition or are rendered into RACM by the work practices during How To Remove Asbestos From A Roof demolition or renovation. Category I nonfriable materials can generally be left in place during demolition activities provided the method of demolition will not make the material into RACM. 

However, for certain types of Category I materials, such as floor tile and linoleum, the department generally recommends removal prior to demolition because these How To Remove Asbestos From A Roof materials could easily be rendered into RACM 3 during the demolition process. 

Also, leaving these materials in place may increase the amount of material considered as asbestos waste and the cost of disposal. If Category I ACM is left in place, work practices must be implemented to ensure the material is not made into RACM during removal or How To Remove Asbestos From A Roof demolition. 

Any activity that will result in the material being subject to sanding, grinding, cutting, abrading, or burning may cause the material to become subject to regulation, depending on the How To Remove Asbestos From A Roof quantity involved. If threshold quantities of Category II materials will be impacted, then they must be removed prior to demolition or renovation activities. 

This removal must be performed in a manner that does not render the material into RACM. If the material is crumbled, pulverized or reduced to powder during the demolition or How To Remove Asbestos From A Roof removal process, the material may become subject to regulation depending on the quantity involved. 

The Occupational Safety and Health Administration, or OSHA, has specific work practice standards for friable and nonfriable Category I and Category II asbestos-containing materials. While the removal of nonfriable How To Remove Asbestos From A Roof materials may not be regulated by the department, the material can still pose a safety risk if handled improperly. 

For any project involving asbestos, whether regulated by the department or not, the use of trained asbestos professionals that are familiar with OSHA standards should be considered for any work involving asbestos. How To Remove Asbestos From A Roof Notification Requirements. 

There are two types of notifications required by the department in regard to demolition and renovation projects, asbestos abatement project notification and How To Remove Asbestos From A Roof demolition project notification. Asbestos abatement project notifications must be submitted to the department at least 10 working days prior to the start of a regulated asbestos abatement project. 

A copy of the asbestos inspection report and laboratory analytical results must accompany the notification. The notification period allows the department time to inspect the How To Remove Asbestos From A Roof project and ensure it is being performed in compliance with all of the applicable requirements. Alternate notification provisions may apply in emergency situations. 

In this event contact the Air Pollution Control Program. The second type of notification is demolition notification. Demolition notifications must be provided to the department at least 10 working days prior to the How To Remove Asbestos From A Roof demolition of any regulated structure. This notice is required even if there is no asbestos identified in the structure being demolished. 

This notification period provides the department the opportunity to inspect the structure prior to demolition to ensure all asbestos issues have been properly addressed. A copy of the asbestos inspection report and laboratory analytical results must accompany this How To Remove Asbestos From A Roof notification. 

In the event a structure is in danger of imminent collapse and has been ordered demolished by a state or local government agency, the department can waive the 10 working day How To Remove Asbestos From A Roof notification period. In this case, notice should be provided as early as possible before, but no later than the following working day. 

A copy of the government order must also be included with the notification. It is the obligation of both the owner and any How To Remove Asbestos From A Roof contractors involved to ensure these notices are provided to the department. Failure to submit the notification is in violation of the department's requirements. 

The department will issue a notice of receipt letter for all asbestos abatement and demolition project notifications. Owners or contractors performing these How To Remove Asbestos From A Roof projects should not begin the project without first receiving the notice of receipt letter. Copies of the required notification forms are available on the department's website.

Asbestos Waste Disposal Requirements Asbestos waste from regulated How To Remove Asbestos From A Roof projects involving threshold quantities of RACM must be handled in strict accordance with the department's requirements for asbestos waste disposal. Wastes from these projects must be transferred to an approved sanitary landfill.

Transfer station by registered asbestos abatement contractors, who are trained in the provisions for proper How To Remove Asbestos From A Roof waste disposal. Non-friable asbestos-containing materials that are not made into RACM are not regulated by the department's asbestos requirements. 

However, this material is considered a solid waste and must be properly disposed of at an approved landfill or transfer facility in accordance with the Solid Waste Management Law. You should contact the How To Remove Asbestos From A Roof facility where you plan to dispose of your asbestos waste for information on how the material should be packaged and delivered to their facility for disposal.

Limit Radon Exposure

Applications can be submitted at any time. The Agency processes Applications on a first-come, first served basis. However, the selected measurement device, the status and availability of EPA radon chambers, and other factors may require additional time when processing Applications for analytical mea  read more..

How And Where Hurricanes Are Formed

Florida, South Carolina, and Hawaii together offer an illustrative example of residential construction styles and techniques common in hurricane hazard areas. 

In Florida, the most popular type of home building is slab-on-grade foundation with concrete block walls an  read more..

Cleaning Up After A Fire

The number of fires caused by lighted tobacco products–almost always cigarettes–increased by a stunning 19 percent in the most recent year studied, Fire Damage Cleaning Up After A Fire according to research by the NFPA (National Fire Protection Association).

But laws requiring that cigarettes be desig  read more..

Cleanup From A Frozen Pipe Break

Frozen Pipes What are some common reasons for frozen pipes?Water pipes will usually be more susceptible to freezing when the outdoor air temperature is below freezing for more than a few days. Special attention should be given when the outdoor air temperature does not rise above zero degrees during&  read more..

Calculate Dehumidification For A Flooded Building

Run-around coils for enhanced dehumidification systems are not a new technology. They are well-described in texts from as long ago as 1939.1, 2, 3, 4 The psychrometric-chart analysis of run-around coils for precooling and reheating is identical to that for ordinary reheat (see sidebar) with one Dehumidification Calculate Dehumidification For A Flooded Building  read more..

How To Dehumidify A Flooded House

Dehumidifier Basics Capacity Dehumidifier capacity is usually measured in pints per 24 hours and is determined by two factors: the size of the space that needs to Dehumidification How To Dehumidify A Flooded House be dehumidified and the conditions that exist in the space before dehumidification. Use the chart below to estimate the ca  read more..

Flood Management Methods

Stand away from, Flood Damage Flood Management Methods not under,the sag. (Under a doorway is safest.) Poke a hole in the ceiling at the edge of the sag so any trapped water can begin to drain. Do not start at the center of the sag because the ceiling may collapse suddenly.

Rescue the Most Valuable Items Find and pro  read more..

Basement Flood

When there is a flood the ground becomes completely saturated and the water has nowhere to go and winds up in your basement. Until the floodwaters recede there is little you can do, make sure the electricity is shut off and do not enter the basement. After the water level has gone down you ca  read more..

Black Mold Cause Serious Health Issues

Coccidioidomycosis is caused by Coccidioides immitis, a dimorphic fungus that grows as a mold in the soil. The mold forms arthroconidia within the hypha, a type of conidia formation known as enteroarthric development. C. immitis is the only species within the primary pathogenic fungi that has this t  read more..

The Best Ways To Dehumidify

In this research, the concept of produced water desalination by using new HD process was laboratory investigated through a lab-constructed HD unit. The influences of the operation parameters such as feed water temperature and flow rate, carrying air flow rate on purified water quality, producti  read more..