This section applies to all occupational exposures to asbestos in all industries covered by the Occupational Safety and Health Act, except as provided in paragraph (a)(2) and (3) of this section. This section does not apply to  Asbestos Removal & Disposal In Ohio construction work as defined in 29 CFR 1910.12(b). 

(Exposure to asbestos in construction work is covered by 29 CFR 1926.1101.) This section does not apply to ship repairing, shipbuilding and shipbreaking employments and related employments as  defined in 29 CFR 1915.4. (Exposure to asbestos in these Asbestos Removal & Disposal In Ohio employments is covered by 29 CFR 1915.1001). 

Definitions. Asbestosincludes chrysotile, amosite, crocidolite, tremolite asbestos, anthophyllite asbestos, actinolite asbestos, and any of these inerals that have been chemically treated and/or altered. Asbestos-containing material (ACM) means any Asbestos Removal & Disposal In Ohio material containing more than 1% asbestos. 

Assistant Secretary means the Assistant Secretary of Labor for Occupational Safety and Health, U.S. Department of Labor, or designee. Authorized person means any person authorized by the employer and required by work duties to be present in Asbestos Removal & Disposal In Ohio regulated areas. 

Building/facility owner is the legal entity, including a lessee, which exercises control over management and record keeping functions relating to a building and/or facility in which activities covered by this standard take place. Certified Industrial Hygienist (CIH) means one certified in the Asbestos Removal & Disposal In Ohio practice of industrial hygiene by the American Board of Industrial Hygiene. 

Director means the Director of the National Institute for Occupational Safety and Health, U.S. Department of Health and Human Services, or designee. 
Employee exposure means that exposure to airborne asbestos that would occur if the Asbestos Removal & Disposal In Ohio employee were not using respiratory protective equipment. 

Fiber means a particulate form of asbestos 5 micrometers or longer,with a length-to-diameter ratio of at least 3 to 1. High-efficiency particulate air (HEPA) filter Asbestos Removal & Disposal In Ohio means a filter capable of trapping and retaining at least 99.97 percent of 0.3 micrometer diameter mono-disperse particles. 

Homogeneous area means an area of surfacing material or thermal system insulation that is uniform in color and texture. Industrial hygienist means a professional qualified by education, training, and experience to anticipate, recognize, evaluate and develop Asbestos Removal & Disposal In Ohio controls for occupational health hazards. PACM means presumed asbestos containing material. 

Presumed asbestos containing material means thermal system insulation and surfacing material found in buildings constructed no later than 1980. The designation of a material as "PACM" may be rebutted pursuant to paragraph (j)(8) of this Asbestos Removal & Disposal In Ohio section. 

Regulated area means an area established by the employer to demarcate areas where airborne concentrations of asbestos exceed, or there is a reasonable possibility they may exceed, the permissible exposure limits. Surfacing ACM means Asbestos Removal & Disposal In Ohio surfacing material which contains more than 1 percent asbestos. 

Surfacing material means material that is sprayed, troweled-on or otherwise applied to surfaces (such as acoustical plaster on ceilings and fireproofing materials on structural members, or other materials on surfaces for acoustical, fireproofing, and other Asbestos Removal & Disposal In Ohio purposes). 

Thermal System Insulation (TSI) means ACM applied to pipes, fittings, boilers, breeching, tanks, ducts or other structural components to prevent heat loss or gain. Thermal System Insulation ACM means thermal system insulation which contains more than 1 percent asbestos. Permissible  Asbestos Removal & Disposal In Ohio  exposure limit (PELS) -- Time-weighted average limit. 

The employer shall ensure that no employee is exposed to an airborne concentration of asbestos in excess of 0.1 fiber per cubiccentimeter of air as an eight (8)-hour time-weighted average (Asbestos Removal & Disposal In Ohio) as determined by the method prescribed in Appendix A to this section, or by an equivalent  Asbestos Removal & Disposal In Ohio  method. Excursion limit. 

The employer shall ensure that no employee is exposed to an airborne concentration of asbestos in excess of 1.0 fiber per cubic centimeter of air (1 f/cc) as averaged over a sampling period of thirty (30) minutes as determined by the method prescribed in Appendix A to this section, or by an equivalent Asbestos Removal & Disposal In Ohio method. 

Exposure monitoring. -- General. Determinations of employee exposure shall be made from breathing zone air samples that are representative of the 8-hour and 30-minute short-term exposures of each employee. Representative 8-hour employee exposures shall be determined on the basis of one or more Asbestos Removal & Disposal In Ohio samples.

Representing full-shift exposures for each shift for each employee in each job classification in each work area. Representative 30-minute short-term employee exposures shall be determined on the basis of one or more samples representing 30 minute exposures associated with operations that are most likely to produce Asbestos Removal & Disposal In Ohio exposures.

Above the excursion limit for each shift for each job classification in each work area. Initial monitoring. Each employer who has a workplace or work operation covered by this standard, except as provided for in paragraphs (d)(2)(ii) and (d)(2)(iii) of this Asbestos Removal & Disposal In Ohio section.

Shall perform initial monitoring of employees who are, or may reasonably be expected to be exposed to airborne concentrations at or above the permissible exposure limit and/or excursion limit. Where the employer has monitored after March 31, 1992, for the permissible exposure limit and/or the Asbestos Removal & Disposal In Ohio excursion limit.

The monitoring satisfies all other requirements of this section, the employer may rely on such earlier monitoring results to satisfy the requirements of paragraph (d)(2)(i) of this section. Where the employer has relied upon objective data that demonstrate that asbestos is not capable of being released in airborne concentrations at or above the permissible Asbestos Removal & Disposal In Ohio exposure limit.

Excursion limit under the expected conditions of processing, use, or handling, then no initial monitoring is required. Monitoring frequency (periodic monitoring) and patterns. After the initial determinations required by paragraph (d)(2)(i) of this Asbestos Removal & Disposal In Ohio section.

Samples shall be of such frequency and pattern as to represent with reasonable accuracy the levels of exposure of the employees. In no case shall sampling be at intervals greater than six months for employees whose exposures may reasonably be foreseen to exceed the permissible exposure limit and/or excursion limit. Changes in Asbestos Removal & Disposal In Ohio monitoring frequency. 

If either the initial or the periodic monitoring required by paragraphs (d)(2) and (d)(3) of this section statistically indicates that employee exposures are below the permissible exposure limit and/or excursion limit, the employer may discontinue the monitoring for those Asbestos Removal & Disposal In Ohio employees whose exposures are represented by such monitoring.

Roof Leak Diverter

Focus on high value items that were not water impacted and items that have special significance. If an entire item cannot be saved, consider parts that could be saved. For example, if a family heirloom such as an antique chest cannot be saved, consider saving the non-porous handles Structural Drying Roof Leak Diverter or  read more..

Program To Address Mold

Program To Address Mold In Neighborhoods Hardest Hit By Hurricane Sandy Unique Public-Private Partnership to Help Expand Mold Treatment Assistance in Affected Neighborhoods Mayor Michael R. Bloomberg and the Mayor's Office of Housing Recovery Operations today announced a new initiative to address wa  read more..

How To Get The Smell Of Raw Sewage Out Of The Hous

The purpose of this publication is twofold: 1. It provides homeowners with basic information on the causes of sanitary sewer backups.2. It provides homeowners with general information on solutions that can be implemented to protect their property from sanitary sewer backups. This Sewage Cleanup How To Get The Smell Of Raw Sewage Out Of The Hous publ  read more..

Remove Paint If You Dont Know If It Contains Lead

The standard also provides for a program of biological monitoring and medical surveillance for all employees exposed to levels of inorganic lead above the action level of 30 µg/m3 (TWA) for more than 30 days per year. The purpose of this document is to outline the medical surveillance provisions   read more..

Drug Lab Clean Up

Burning a meth-contaminated structure in lieu of decontamination is prohibited, unless priorapproval has been granted. Approval shall be obtained from the Kentucky Division for Air Quality Meth Lab Cleanup Drug Lab Clean Up prior to a training or practice burn. Safety of firefighter entry into a former meth lab structu  read more..

How Tenants Should Cleanup After Pets

Landlord to supply possession of the dwelling unit.(a) At the commencement of the term the landlord shall deliver possession of the premises to thetenant in compliance with the rental agreement and AS 34.03.100 . The landlord may, Tenant Move Out Cleanup How Tenants Should Cleanup After Pets after serving a notice toquit under AS 09.45.100 - 09.  read more..

How To Get Rid Of Standing Water In A Crawl Space

Chemical preservative treatment against decay is especially likely to repay its cost for porches, outside steps, and railings made of wood of low natural durability. Crawl Space Drying How To Get Rid Of Standing Water In A Crawl Space There are commercial impregnation treatments available for wood to be painted. 

When a  read more..

Carpet Cleaning Without Water

Constituents from six major chemical groups were measured: radionuclides, major and trace elements, organo chlorine pesticides and PCBs, PAHs, UWI compounds, and current-use pesticides. The results of the chemical analyses are presented in tables 2–7. Interpretations of data listed in this report a  read more..

Public Water Systems Affected By Boulder Floods

General Draft Guidance for Public Water Systems Affected by September 2013 Flood Emergencies Water systems that have had a power outage or disruption in service Any water system that has lost power and/or had a disruption in water supply during the flood emergency should assume that there has b  read more..

Clean Up Water Damage Carpet

Installation shall be in accordance with an approved design and plan. Details of construction shown on the drawings but not included herein are considered as a part of this specification. Construction activities shall be in accordance with applicable OSHA regulations.SITE PREPARATION Clearing and&nb  read more..