When dealing with larger Water Damage projects additional control measures should be applied for sensitive areas such as patient care, office settings or vivarium areas.  The application of these measures should be made on a case-by-case basis, such as enclose and close off critical areas with plastic sheeting, like openings to adjacent spaces. Secure the HVAC system, by sealing supplies ducting and return plenums and shutting off the system when possible.

    1. Maintain a very slight negative or neutral pressure, recirculate the air through a portable HEPA reusable filter.  If use of a HEPA filter or other portable system would disturb more dust and mold particles than it captures, or there's no possible discharge point that is away from occupied spaces, it must not be used during the Water Damage, demolition or cleanup. The portable Microcon Units will not be used for this purpose.  Microcon units are to be used for relatively “clean” document care environments, and not for controlling dusts and mold particles associated with demolition or construction projects.
    2. Place a drop cloth where needed and step-off mats outside of the Water Damage work area. The cleaning of all surfaces potentially impacted by the remediation work, as well as including all spaces beyond the immediate work area.  Cleaning will include the use of a HEPA vacuum, damp cleansing of desks or other hard surfaces where people could come into contact with released mold spores, and in document care or other highly sensitive restoration areas it may also include damp sponge cleaning of walls and ceilings to remove and release materials.
    3. After the repairs and Water Damage remediation are complete, a re-inspection of the area after 24-48 hours to re-confirm the conditions are acceptable. The document restoration supervisor and/or project manager must verify the satisfactory completion for small jobs or jobs where there is very little or no potential impact of the restoration employee health. The overall project supervisor should contact the homeowner or business manager to help verify that large or complicated projects, or sensitive areas, have been completely and restored to acceptable conditions. The following practices must be required for all document cleanup employees performing the dehumidification/restoration work.
    4. Wear disposable foot and body covers and appropriate disposable rubber gloves during the Water Damage remediation.  Discard these items in a sealed, sterile container or bags before leaving the remediation vicinity to prevent tracking or the releasing of contaminated materials.  Put on new foot protective covers and disposable gloves when you reenter the site. Tyvek disposable one-piece suits/coveralls, and hairnets in most cases, are absolutely required to protect both the employee and to minimize the spreading of mold dusts and contaminants outside of the worksite.  If disposable protective clothing is worn, dispose of it in a sealed bag or container before leaving the remediation area. Always wear appropriate eye protection for work that might expose you to eye hazards. Be sure to wash your hands, face, and any other exposed skin before leaving the Water Damage worksite, or as soon as possible afterwards.

    Guidelines For Fire And Smoke Damage Repair

    The National Fire Protection Association (NFPA) has joined forces with theInternational Council on Active Aging(ICAA) to launch this year's Active Aging Week, September 25 to October 1. In celebration of this national health observance, NFPA and ICAA will work with older adults at venues across the   read more..

    Laws In Wisconsin Regarding Asbestos Siding

    Asbestos fibers are a known human carcinogen. Lung cancer, mesothelioma cancer of the chest cavity lining and asbestosisa fibrotic scarring of lung tissue have been proven to result from asbestos exposure. The Clean Air Act (CAA) of 1970 requires Asbestos Abatement Laws In Wisconsin Regarding Asbestos Siding the U.S. Environmental Protection Agency (E  read more..

    How To File An Insurance Claim For Smoke Damage

    EMERGENCY RESPONSE RESOURCES Personal Protective Equipment Respirators Protective Clothing Skin Exposures Eye Protection Hearing Protection Personal protective equipment is very important for any emergency responder. There are five main types of PPE that are covered on this page: respirators and pro  read more..

    Compulsive Hoarding Debris Removal

    Although it seems like hoarding has only recently received attention from certain academic studies, it is now considered to be a form of self-neglect. Despite all of the limited data on the scope of the problem, it is thought that as many as one in twenty Americans could have this serious hoa  read more..

    How To Stop Mold In A Basement Closet

    Controlling Moisture
    In general, you should address the following issues when remodeling your home. Read about Best Practices
     Using Barriers to Contain Dust and other Pollutants Combustion Appliance Backdrafting Using Ventilation Basement Drying How To Stop Mold In A Basement Closet to Contain Dust  read more..

    Flood Zone Maps And Asbestos Disposal

    As the flooding recedes, communities are moving from the more immediate emergency response to longer term cleanup and recovery. The Department has updated this section of its guidance to reflect the changing nature of the disaster response, and to clarify questions we have received regarding buildin  read more..

    Fire damaged odor removal

    In order to successfully remove smoke odor from your Odor Control Fire damaged odor removal home there are a few things you could try. Hopefully this article will help these are just a few of the things that professionals try using common things around your home. Inside of your refrigerator you could take baking soda in an   read more..

    How To Dispose Of Asbestos Siding In Texas

    This mandatory appendix specifies the procedure for analyzing air samples for asbestos and specifies quality control procedures that must be implemented by laboratories performing the analysis. The sampling and analytical methods described below represent the elements of the available monitoringÂ&n  read more..

    Asbestos Removal Specifications In Tennessee

    Counting Fibers (1) Place the prepared sample slide on the mechanical stage of the microscope. Position the center of the wedge under the objective lens and focus upon the sample. (2) Start counting from one end of the wedge and Asbestos Abatement Asbestos Removal Specifications In Tennessee progress along a radial line to the other end (c  read more..

    Lead Paint Removal Requirements

    Where any employee is exposed to lead above the permissible exposure limit for more than 30 days per year, the employer shall implement engineering, work practice, and administrative controls to reduce and maintain employee exposure to lead in accordance with the following implementation schedule ex  read more..