Meth Lab Cleanup >> Meth Manufacturing Labs

Once decontamination is completed, the certified contractor must perform the post-decontaminationsampling to determine compliance with the decontamination standard. It is also the responsibility of thecertified contractor to arrange for disposal of all waste materials, Meth Manufacturing Labs inspect the dumpster, truck, roll-off boxor other container of structure contents and waste prior to the waste leaving the site. Inspection is doneto ensure that no hazardous chemicals, containers of anhydrous ammonia, or biohazards (sharps, etc.)are improperly disposed.
 
The certified contractor must also ensure that all furniture, clothing, carpeting,and other items disposed have been destroyed Meth Manufacturing Labs or rendered unusable to prevent scavenging of theseitems. All wastes must be disposed of in accordance with state and federal EPA and DOT regulations.A Contractor’s Certificate of Decontamination (CCD) must be submitted to the Kentucky Division ofWaste Management by the certified contractor within sixty (60) days after decontamination services areperformed on a property.
 
 The CCD report, documents the assessment, decontamination, actions taken ata site, and chemical screening results. Electronic Meth Manufacturing Labs version can be requested from KDWM.KDWM reserves the right to conduct oversight, either with its own staff or a qualified contractor,of the meth lab decontamination activities performed by the certified contractor and to collect itsown post-decontamination samples to verify that the decontamination standard was met.
 
The certified contractor and the property owner shall retain all records related to the decontamination ofthe inhabitable property for a period of at least five (5) years after the CCD has been issued. Thisincludes the CCD, preliminary assessment findings, all data and laboratory Meth Manufacturing Labs analytical results of the postdecontamination sampling and quality assurance/quality control records, and field sampling logs.B. Lab Site EntryOnce notified by the local health department, law enforcement shall post signs on the exterior doors ofthe property with Notice of Meth Contamination signs warning of possible chemical contamination.
 
 The notice will remain on the property until it has been decontaminated by a certified contractor in accordancewith the law and this guidance document.Before entering the site, the certified contractor shall carefully consider the hazard potential fromexposure to chemical residues, confined spaces or other physical hazards, and proper Meth Manufacturing Labs personal protective equipment (PPE) to perform the decontamination. It is the contractor’s responsibility to ensurethat all personnel under their supervision have the necessary safety equipment and that their workactivities are conducted safely in accordance with KyOSH regulations in 803 KAR 2:403, and 29 CFR1926.50 to 1926.65, the construction industry standard and the federal HAZWOPER regulations forGeneral Site Worker.
 
 Keep in mind many of the spaces that shall require entry and cleaning could meetthe definition of a Confined Space per 803 Meth Manufacturing Labs KAR 2:200, and may require specialized training. The certified contractor shall always wear the appropriate personal protective equipment (PPE) includingrespiratory protection if needed, based on site conditions and air monitoring data, and based on the typeof work they are performing.
 
Monitoring/sampling equipment should include, but not be limited to:
• A photo-ionization detector (PID), flame ionization detector (FID) or similar device to check for thepresence of organic vapors in the air. The instrument must be properly calibrated and maintained,
• pH paper,
• De-ionized water,
• Camera (for documentation),
• Ruler and masking tape or pre-fabricated 10 cm by Meth Manufacturing Labs 10 cm template,
• Sample collection supplies including gauze pads, methanol, sample containers and cooler.
 
One hazard that shall not be overlooked when assessing or decontaminating a meth lab is hypodermicneedles. Needles can sometimes be mixed in with the trash and other wastes Meth Manufacturing Labs and can be found infurniture or intentionally hidden in unexpected places. The potential for transmission of blood-bornepathogens including HIV/AIDS or hepatitis through needle "sticks” can be a significant hazard for siteswhere "users” were present. Because of the possibility that the needles can penetrate personal protectiveequipment (PPE), extra caution should be taken by the certified contractor and their staff.
 
 Also, somelabs may have "booby traps” in place to make it difficult for law enforcement or others to access parts ofthe property. Caution should be taken when entering or investigating any Meth Manufacturing Labs former meth lab property.C. Preliminary AssessmentThe certified contractor shall conduct a preliminary assessment of the property and all structures onthe property. This information will be critical to how the property should be effectively and safely decontaminated.
 
Pre-decontamination sampling is not required, but samples may be collected ofsuspected cooking areas, spills or stained Meth Manufacturing Labs locations, waste disposal areas, HVAC system, plumbingfixtures, and other locations to determine the most effective plan for decontamination of the property.Once the property is decontaminated, post-decontamination samples are required.
 
The following shallbe collected and documented in the Contractor’s Certificate of Decontamination (CCD), DEP 5035,January 2009:
• Obtain copy of the KDWM Clandestine Drug Lab Meth Manufacturing Labs Preliminary Assessment Tier Selection Criteria,DEP 1016, January 2009 available by open records request to KDWM.
• Property description (i.e., physical address, latitude and longitude, legal description, physicallayout of the property, structural features, etc.)
• Photographic documentation of site
• During the initial walk-through the certified contractor shall note hazardous chemical use orstorage areas, waste disposal areas, cooking areas, chemical stains, fire damage, and otherobservable damage.
 
 
• Information about surfaces, furnishings, appliances, and other Meth Manufacturing Labs features
• Inspection of HVAC system
• Inspection of plumbing, septic system, sewer system
• Inspection of garages, barns, and other outbuildings on the property
• Identification of adjacent areas/units in multiple dwellings that may require cleaning
• Identification and documentation of areas of contamination
• Outdoor inspection for evidence of burn or trash pits, discolored soil, or dead vegetation,indicating possible contamination of water and/or soil.
 
 Site-Type Considerations
The layout of the lab, its structural characteristics and potential future use shall be considered whendesigning a decontamination plan. Lab sites may be loosely categorized as follows:
• Private occupancy structure, e.g., single family home and attached garage, apartment ormultiple dwelling
• Mobile residence, e.g., motor home, camper or manufactured Meth Manufacturing Labs home
• Non-occupancy structure, e.g., detached garage, barn, tool shed, etc.8) Articles of clothing and toys have the potential to be heavily contaminated withcontaminants of concern (COC), therefore they shall not be reused.
 
KDWM recommends that the certified contractor remove any clothing, children’s toysor other items left behind by the meth lab operator or their families, render themunusable, properly dispose of them, Meth Manufacturing Labs and provide disposal receipts. This step shall bephoto documented. Since removal and replacement of appliances is not anticipatedwith a Tier 1 Response, wash and clean all appliances thoroughly. For evaluatingpersonal items and contents of the structure, see Section L of this guidance.9) Please note all contaminated properties shall require at least a Tier 1 cleanupresponse.

Standard Reference Guide For Professional Mold R

States with plans approved by STANDARD & REFERENCE GUIDE FOR PROFESSIONAL MOLD REMEDIATION under section 18(b) of the OSH Act must adopt standards and enforce requirements that are at least as effective as federal requirements. There are currently 26 state plan states: 22 of these administer pla  read more..

Calculate Space In A Water Damaged Room For A Dehu

Compression Ratio Dehumidification APPLICATIONS OF TECHNOLOGY: Commercial and residential buildings ADVANTAGES: Reduces indoor moisture to inhibit mold growth and moisture damage Energy efficient—air does not have to be reheated prior to delivery No refrigerant Dehumidification Calculate Space In A Water Damaged Room For A Dehu or desiccant material   read more..

Clean Up Flood Damage And Hazardous Materials

In all likelihood, hazardous materials will be encountered during the cleanup phase of the flood recovery effort: containers and other vessels that may hold materials that can either pose an immediate risk to cleanup crews if disturbed or might be classified as a hazardous waste for disposal purpose  read more..

Flood Damage

In the ideal worlds, edifices can be designed so that flooding can never happen; however, in the real world, water sometimes gets out of control in all edifices. When a water emergency happens, rapid reaction to seepage, spillage, flooding, water damage, or backups has most benefits. Rapid re  read more..

How To Keep Moisture Out Of Your Basement

TIPS FOR DRYING OUT A WATER-DAMAGED BUILDING F. Mitchener Wilds, Senior Restoration Specialist
 Once a building has been exposed to a large volume of water, either floodwater or rainwater, steps must be taken to dry the building out, assess damage, and Basement Drying How To Keep Moisture Out Of Your Basement plan for repairs a  read more..

How To Check If My Property Has Ever Flooded

Concrete retaining walls can be constructed to withstand a large variety of structural loading conditions. They are particularly useful in steep situations where protection is needed close to the top or Flood Damage How To Check If My Property Has Ever Flooded base of a slope. 

The strength of the retaining w  read more..

Water Extraction

By conditioning our crawl spaces this may make them perform better than just a vented crawl space in the terms of safety, health, comfort, durability and energy consumption. When we condition our crawl spaces, they do not cost more to build than a vented Crawl Space Drying Water Extraction. Your existing vented crawl spaces  read more..

How To Clean Mold

Fungi and Bacteria in Ventilation Systems Fungi growing in ventilation systems may contaminate indoor environments and cause a variety of problems. Some fungi can cause lung infections. Many fungi can cause allergic reactions in susceptible people and respiratory irritation in non-allergic people.In  read more..

OSHA Regulations For Perimeter Fencing

The NHC official forecasts did outperform many of the individual intensity models.Only the GHMI (at the 96 and 120 h periods) and the FSSE (at the 72-120 h periods) had smaller errors than the official intensity forecasts. However, Emergency Board up OSHA Regulations For Perimeter Fencing the intensity model consensus (ICON)bested the offici  read more..

Flood Damage

The following information is primarily useful to libraries that have been damaged in recent storms, this information is also helpful to those persons trying to salvage important, valuable and historic belongings and collections. In some Document restoration Flood Damage cases the use of scanning and digital edit and usin  read more..