Emergency Board up >> How To Board Up Windows In A Vacant House

All licensed contractors who desire to participate in the Emergency Board-Up eligibility list shall prepare and file an application with the Fire Marshal at any time during the month of May to be reviewed for inclusion in the following fiscal year (July through June). The application shall include, How To Board Up Windows In A Vacant House but may not be limited to the following:

The name of the business, its business address, and telephone Number;2. The business owner's name, residence address, and telephone Number; Evidence of current liability insurance, comprehensive and general liability auto insurance, and How To Board Up Windows In A Vacant House workers compensation insurance; Evidence of a valid "B" contractors license;

Evidence of a current City of Sunnyvale business license.6. Such other How To Board Up Windows In A Vacant House information as the Fire Marshal may deem relevant and necessary to evaluate the qualification of the applicant.B. Applications must be signed and dated by the owner of said business acknowledging agreement to comply with all provisions of the Emergency Board-Up policy. 

Any contractor who has appropriately applied for inclusion on the Board-Up referral list, but who has not met all requirements by June 30th of the same year, may, How To Board Up Windows In A Vacant House at the discretion of the Fire Marshal or his/her designee, have the application cancelled and must then wait for the next application period. The Fire Marshal will notify the interested contractor, in writing, of his acceptance for placement on the Emergency Board-Up referral list. 

Any applicant meeting stated requirements shall be approved for inclusion in the Emergency Board-Up rotation; however, the city reserves the right to refuse new applications if, How To Board Up Windows In A Vacant House in the opinion of the Fire Marshal, it is in the city's best interest to limit the number of contractors on the Emergency Board-Up rotation list. 

Approved contractors will be added to the rotation list based on the date the application was received by the Fire Marshal. D. All accepted applications shall be valid for the following fiscal year (July through June). Emergency Board-Up contractors shall, thereafter, How To Board Up Windows In A Vacant House be responsible for annually renewing their placement on the Emergency Board-Up referral list. 

All renewals and new applications shall be submitted during the month of May, and How To Board Up Windows In A Vacant House will be subject to review of the minimum requirements of this policy. CAUSE FOR REMOVAL FROM THE LIST The Fire Marshal may remove a contractor from the Emergency Board-Up referral list if, upon investigation, it is determined that:

The applicant failed to respond within the maximum allotted ninety (90) minutes; or The applicant fails to maintain the requisite California State Contractor license and How To Board Up Windows In A Vacant House tools/equipment to operate a Board-Up business; or The applicant fails to maintain or cannot obtain the minimum required insurance; or 

The applicant engages in practices detrimental to the efficient operation of this policy, the operations of Sunnyvale Public Safety department, How To Board Up Windows In A Vacant House or its relationship with the public; or5. Such other causes exist which, in the discretion of the Fire Marshal, would not be in the interest of the public, the City of Sunnyvale, or the Department of Public Safety. 

The Fire Marshal shall notify the applicant, in writing, as to removal fromthe list and How To Board Up Windows In A Vacant House shall set forth the cause(s) upon which such removal has beenmade. The written notification shall be sent, certified mail/return receipt,to the business address listed on said application.Within ten (10) business days after receiving the written notice ofremoval, the contractor may submit a request, in writing, to the FireMarshal for an opportunity to respond to the removal. 

If such a request is submitted, How To Board Up Windows In A Vacant House the Fire Marshal shall notify the contractor of the time and place where such responses may be made. The contractor may then present his/her position and such evidence deemed relevant to the Fire Marshal. Such opportunity shall not be a formal evidentiary hearing. The decision of the Fire Marshal in the case will be final.

The Appellant shall post five hundred dollars ($500.00) either in cash or cashier's check with the City of Sunnyvale to cover all, How To Board Up Windows In A Vacant House or a portion of, the appeal costs. Any and all costs of such appeal will be recovered by the City of Sunnyvale from the appellant when the review finds in favor of the City of Sunnyvale. 

A full and complete accounting shall be supplied to the unsuccessful appellant with the findings. "HARDENING THE TARGET"BOARD UP PROCEDURES Protecting valuable buildings from the weather and from illegal entry can be accomplished by improving security, How To Board Up Windows In A Vacant House organizing block watches, improving lighting, periodic patrols, and by following these directions. 

DISCONNECT ALL UTILITIES AT THE STREET Turn off water at the street and drain the system to its lowest point. Leave faucets open and put anti-freeze in all traps containing water. Have the utility company disconnect electricity at the street and How To Board Up Windows In A Vacant House remove and cap meters.C. Shut off LNG supply at the street.

Disconnect and remove LPG and heating oil tanks.2. REMOVE ALL FLAMMABLES AND COMBUSTIBLES FROM INSIDE AND OUTSIDE THE BUILDING After all entrances are secured, the interior worker should exit the building, using a ladder,through a window, How To Board Up Windows In A Vacant House if such exists, at least 10 feet above the ground.

Nail or screw a plywood sheetover the worker's exit. Patrol the building periodically to checkthe security.A. Remove all upholstered furniture, combustible materials How To Board Up Windows In A Vacant House and trash fromthe building, including the basement and attic.B. Remove trash and How To Board Up Windows In A Vacant House trash containers and combustible furniture from exteriorstairwells, porches, fire escapes and outbuildings. 

Remove shrubbery and vegetation thatcould support or spread a fire. Openings in the basement, first floor doorsand windows and any point of entry accessible from a porch, How To Board Up Windows In A Vacant House fire escape or other potentialclimbing point require additional securitymeasures. These openings should be barricadedwith plywood, 2x4s, bolts and nails. 

Openings that are at least 10' from ground levelwhich are not accessible from a porch, fireescape, roof, or other climbing point can besecured with nails in each brace, How To Board Up Windows In A Vacant House and every12" around the perimeter. For these openingsthe plywood should be fitted so that it restssnugly against the exterior frame, butting upto the siding on wood frame buildings and upto the brickwork on brick buildings. It may benecessary to remove the staff bead so thisfit can be flush and tight.

MOLD AND WATER DAMAGE FROM FLOOD RESPONSE

FLOOD RESPONSE - WATER DAMAGE AND MOLD HOW DO I PROPERLY CLEAN UP MY HOME IF IT HAS BEEN FLOODED OR HAS WATER DAMAGE? First, make sure electricity and natural gas or propane tanks are shut down. The Centers for Disease Control and Prevention (CDC) recommends that electricity and Mold Remediation MOLD AND WATER DAMAGE FROM FLOOD RESPONSE   read more..

Structural Drying Log

If an intrusive/penetrating moisture meter is not available, a non-intrusive, penetrating moisture meter (Figure 3b) may be used; however, keep in mind that the material moisture results measured from non-intrusive meters may be less accurate than intrusive meters. Kitchen cabinets, bathroom vanitie  read more..

Asbestos Removal Courses In Wisconsin

"Category II nonfriable" is defined as "any material, excluding category I nonfriable, containing ... asbestos ... that ... cannot be crumbled ... to powder by hand pressure." This includes rigid exterior siding and boards by the trade name "transite". Category II Asbestos Abatement Asbestos Removal Courses In Wisconsin may not   read more..

How To Get Rid Of Mold In A Crawlspace

Examples of where to insulate. 1. In unfinished attic spaces, insulate between and over the floor joists to seal off living spaces below. Attic access door. In finished attic rooms with or without dormer, insulate between the studs of "knee" walls, between the studs and rafters of exterior walls and  read more..

How To Keep Moisture Out Of Your Basement

TIPS FOR DRYING OUT A WATER-DAMAGED BUILDING F. Mitchener Wilds, Senior Restoration Specialist
 Once a building has been exposed to a large volume of water, either floodwater or rainwater, steps must be taken to dry the building out, assess damage, and Basement Drying How To Keep Moisture Out Of Your Basement plan for repairs a  read more..

Grants For Flood Victims

You can protect the furnace,water heater, washer, and dryer from shallow flooding with a low flood wall built around the appliance. a concrete or wooden wall 1 or Flood Damage Grants For Flood Victims  2 feet high can stop low-level flooding. The wall should be waterproofed with plastic sheeting or waterproofing comp  read more..

Remove Smoke Odor From Electronics

One of these rooms (the museum boardroom) was used to store kits of soot cleanup clothing and cleaning materials and supplies and was also used as a staff room and change room. The second and third rooms were designated to receive the first of the salvaged displays and artifacts that would be r  read more..

Asbestos Testing

Asbestos might still be located in many different structural materials and products, in spite of their age. Consequently, the only way to ultimately know is to have samples of the material in question analyzed. Check your local health office for reports on sampling and testing for more   read more..

Storm Damage Building Demolition Removal Cost

Local governments manage the debris collection process. They can either perform debris collection work with local employees or use debris collection contractors.If contractors are used, their work and charges should be monitored to ensure the contract costs are eligible for FEMA funding and [ME  read more..

Trash Clean Up From The Nashville Flood

Nashville flooding, FEMA Disaster No. DR 1909 TN (Source: FEMA) Some contractors, in order to increase their payments under their debris removal contract, will collect ineligible debris, such as debris not located on the right-of-way, and haul it to the collection site for payment. This can happen a  read more..