Electronic Restoration >> Troubleshoot An Electronic Circuit Board

Optical fiber cable assemblies consist of a combination of two or more of the following parts: optical fiber, cable, connectors, and assemblies. In most cases optical fiber is not used without some type of interconnection. Some of the test methods presented here have been developed at the GSFC Code 562 Technology Validation Assurance (TVA) Laboratory for Photonics Troubleshoot An Electronic Circuit Board and are noted as such. 

The TVA has developed these methods over the past 8 years to address the specific needs of space flight projects at GSFC and to address the failure modes that are common Troubleshoot An Electronic Circuit Board to Commercial-Off-the-Shelf (COTS) optical fiber devices. A references column is provided in Table 4 to provide insight into known failure modes and the test methods used to characterize them. 

All references cited hereare available at http://nepp.nasa.gov/photonics web site. It is important to note Troubleshoot An Electronic Circuit Board that military products cannot in general be assumed to be qualifiedfor space flight. Military specifications are not typically written to accommodate spaceflight requirements. The choice of military qualified fiber components is also verylimited. 

Therefore most of the parts and assemblies used for space flight are COTS.Many of the listed tests are common to commercial and space applications and can beconducted economically only by the manufacturer. In those cases, Troubleshoot An Electronic Circuit Board the manufacturer'scertified results are acceptable. Tests that are critical to determining the suitability ofproduct for space flight are either verified independently or performed in addition tomanufacturers' tests.

Table 3 summarizes the tests to be performed on optical fiber, optical fiber cable, opticalfiber connectors, and optical fiber assemblies that include either optical fiber terminatedto connectors or optical cable terminated by connectors. For each test and part type, a symbol letter is used to designate the entity by which the test is to be conducted: themanufacturer, Troubleshoot An Electronic Circuit Board end user, or both. 

A key is included at the bottom of the table.The Fiber Optic Test Procedures (FOTP-XXX) listed in Table 4 correlate directly to theEIA/TIA 455-XXX series. EIA/TIA 455 has been replaced by FOTP for brevity.Although more tests are done, Troubleshoot An Electronic Circuit Board those specified here are performed typically by the vendor. The tests presented here are required by NASA projects for validation purposes on allgrade levels (i.e., levels 1, 2, and 3). 

There are no distinctions in the validation andqualification of fiber optic components at this time between the grade levels. Testing offiber optics for space flight applications should be determined from the application andreliability requirements of the project. It is the responsibility of the user to specify detailed test conditions and Troubleshoot An Electronic Circuit Board pass/fail criteria for each test. 

These values shall be based on the nearestequivalent military specifications, manufacturer's specification, or the application, Troubleshoot An Electronic Circuit Board whichever is most severe.2/ The group 1A samples shall be subdivided as specified in the table for groups 2 to 6, inclusive. These minimum sample sizes are needed for qualification: Level 1 to 12 fuses Level 2 to 8 fuses Level 3 to 4 fuses3/ 

External visual examination required after testing to verify no evidence of mechanical damage.4/ The power supply shall have Troubleshoot An Electronic Circuit Board an open-circuit voltage not less than the specified voltage rating of the fuse under test.5/ Fuses rated < +125 °C shall be tested to condition A.6/ Materials listed in NASA Reference Publication 1124 that meet TML and CVCM limits are acceptable for use without further testing.7/ 

Not applicable for SMT fuses.8/ Not applicable for SMT fuses utilizing thick or Troubleshoot An Electronic Circuit Board thin film technologies. Hollow SMT fuses constructed with wire-in-air technology shall be subjected to the group 4 inspections. Fuses are specified to interrupt within a maximum of 5 seconds when driven at 200% of their rated current for nominal ratings up to and including 10 amperes. 

A fuse with a nominal rating of 15 amperes is specified to interrupt within a maximum of 10 seconds when driven at 200% of its rated current.The power supply shall be capable of delivering appropriate levels of current to achieve short fusing times.2/ In a space environment, Troubleshoot An Electronic Circuit Board the possible escape of air from inside the fuses reduces the filament cooling mechanism (heat transfer by conduction). 

Thislowers the blow current rating and decreases current capacity with time, making it necessary to derate current ratings on fuses used in space applications.3/ Fuses rated at 1/2 ampere or below are especially affected by loss of air; thus, Troubleshoot An Electronic Circuit Board their derating factors are larger.4/ Current derating factors are based on data from fuses mounted on printed circuit boards and conformally coated. 

Other types of mountings require Troubleshoot An Electronic Circuit Board project office approval. It should be noted that the lifetime of the fuses is controlled by two factors: cold resistance of the fuse and the heat sinkingprovided by the installer. The thermal resistance of the fuse to the thermal ground is very important, as is the case with power transistors and power diodes mounted on circuit boards.5/ 

Recent studies have shown the occurrence of enduring arcs in fuses rated at 125 volts when the applied voltage is greater than 50 volts. Therefore, Troubleshoot An Electronic Circuit Board the voltages on these fuses should be derated to 50 volts or less.6/ Electrical transients produce thermal cycling and mechanical fatigue that could affect the life of the fuse. 

For each application, Troubleshoot An Electronic Circuit Board the capability of the fuse to withstand the expected pulse conditions should be established by considering the pulse cycle withstanding capability for nominal I2t (energy letthrough the fuse) specified by the manufacturer. Any test that has been performed during screening on the samples selected for qualification tests need not be repeated.2/ 

Generic data may be used in lieu of testing as long as the data meets the following requirements:i) It is obtained on parts built to S-311-P-079 specifications using the same materials and Troubleshoot An Electronic Circuit Board similar construction and design, andbuilt in the same facility as the flight parts.ii) The data is less than 2 years old relative to the lot date code of the flight parts.3/ Samples for Groups 2, 3, and 4 should be selected from parts that have passed Group 1 tests.

How To Paint Over Fire Damage On Drywall

The president of NFPA (National Fire Protection Association) today called for all nursing homes in the U.S. to be equipped with fire sprinklers, in the wake of two recent nursing home fires in Hartford and Nashville, Fire Damage How To Paint Over Fire Damage On Drywall where a total of 24 people died. (See NFPA's fact sheet on nursing home fire s  read more..

Remove Lead Based Paint From Wood Furniture

To avoid ingesting lead, workers should not eat,drink or smoke on the job. Workers need to clean up carefully. Before leaving the work area, they should dispose of their coveralls, and remove the dust from their clothes with a HEPA filtered vacuum cleaner. And workers should shower as soon as they c  read more..

Safely Remove Lead Based Old Paint From Wood

The Abatement of Lead Paint Hazards*Under Maryland law, lead paint abatement is "a set of measures designed to eliminate or reduce lead-based paint hazards." Anyone who provides a lead paint abatement service be accredited by the Maryland Department of the Environment. An accredited contractor must   read more..

How To Fix Water Damaged Carpet

In handling materials that are believed to be contaminated with asbestos it is recommended that, at a minimum, you wear personal protective equipment such as disposable coveralls, gloves, goggles, and most importantly, some form of respiratory protection. A basic dust mask or the N95 dust mask recom  read more..

Fema Flood Zones And Debris Disposal

Household Chemicals (i.e., Household Hazardous Waste (HHW)) can be taken to a county or municipal HHW facility for recycling or potentially reuse. Check with your local environmental health representative to see if a temporary HHW collection site has been established. If HHW cannot safely be removed  read more..

How To Test For Hoarding

Over the past year, my office has received an unusually high volume of calls from constituents who find themselves in difficult situations because of their out-of-control, overly cluttered apartments. Dismayed by the number of residents that are not only in danger of losing their homes, Hoarding How To Test For Hoarding&nb  read more..

FEMA Maps

Are lenders required to escrow flood insurance payments? Yes. If a lender, its servicer, or a Federal Agency lender requires the escrow of taxes, insurance premiums, fees, or any other charges for a loan secured by improved residential real estate or mobile homes, it shall also require the escrow of  read more..

Hurricane Protection Techniques

 For other basic wind speeds, or for an importance factor of 1, multiply the tabulated number of #12 screws by to determine the required number of #12 screws or (¼ pan-head screws) required for the desired basic wind speed, VD (mph) and Wind Damage Hurricane Protection Techniques importance factor, I.4. 

  read more..

Fire Damage

Artistic Emergency Board up Fire Damage means painting on material that is used to secure door, window, or other openings to resemble the original opening which they are covering. There is to be no standard pattern requirement. The overall purpose is to have a structure that does not draw attention to the eye of someo  read more..

How To Rebuild Fire Damaged Homes

Pressure wash, scrub or disinfect all exterior surfaces including walls, walks, drives, decks, window and Fire Damage How To Rebuild Fire Damaged Homes deck screens, etc. Wash and disinfect all interior walls and hard surfaces with mild soap or other appropriate cleaning solutions or products, and rinse thoroughly.

Don't   read more..