Asbestos Abatement >> Asbestos Abatement Contractors

Aggressive sampling. "Aggressive sampling" shall mean a method of sampling in which the individual collecting the air sample creates activity by the use of mechanical equipment during the sampling period to stir up settled dust and simulate activity in that area of the building. AHERA. "AHER" shall mean the Asbestos Hazard Emergency Response Act of 1986. AIHA. "AIH" shall mean the American Industrial Hygiene Association. Airlock. "Airlock" shall mean a system for permitting entrance and exit while restricting air movement between a contaminated Asbestos Abatement Contractors area and an uncontaminated area. It consists of two curtained doorways separated by a distance of at least three feet such that one passes through one doorway into the airlock.

Allowing the doorway sheeting to overlap and close off the opening before proceeding through the second doorway, thereby preventing flow-through contamination. Air sampling. "Air sampling" shall mean the process of measuring the fiber content of a known volume of air collected during a specific period of time. The Asbestos Abatement Contractors procedure utilized for asbestos follows the NIOSH Standard Analytical Method 7400 or the provisional transmission electron microscopy methods developed by the USEPA and/or National Institute of Science and Technology which are utilized for lower detectability and specific fiber identification. Ambient air monitoring.

"Ambient air monitoring" shall mean measurement or determination of airborne asbestos fiber concentrations outside but in the general vicinity of the worksite. Amended water. "Amended water" shall mean water to which a surfactant has been added. ANSI. "ANSI" shall mean the American National Standards Institute. Area air sampling. "Area air sampling" shall mean any form of air sampling or Asbestos Abatement Contractors monitoring where the sampling device is placed at some stationary location. Asbestos. "Asbestos" shall mean any hydrated mineral silicate separable into commercially usable fibers, including but not limited to chrysotile (serpentine), amosite (cumingtonite-grunerite), crocidolite (riebeckite), tremolite, anthrophyllite and actinolite. Asbestos-containing material.

"Asbestos-containing material" (ACM) shall mean asbestos or any material containing more than one percent asbestos. Asbestos-containing waste material. "Asbestos-containing waste material" shall mean asbestos-containing material or asbestos-contaminated objects requiring disposal. Asbestos-contaminated objects. "Asbestos-contaminated objects" shall mean any Asbestos Abatement Contractors objects which have been contaminated by asbestos or asbestos-containing material. Asbestos assessment report. "Asbestos assessment report" shall mean the "Form ACP-5" form, as approved by DEP, by which a DEP-certified asbestos investigator certifies that a building or structure (or portion thereof) is free of ACM or the amount of ACM to be abated constitutes a minor project.

Asbestos handler. "Asbestos handler" shall mean an individual certified by the Department who disturbs, removes, encapsulates, repairs, or encloses asbestos material. Asbestos handler supervisor. "Asbestos handler supervisor" shall mean an individual certified by the Department who supervises the handlers during an asbestos project and ensures that proper asbestos abatement Asbestos Abatement Contractors procedures as well as individual safety procedures are being adhered to. Asbestos project notification. "Asbestos project notification" shall mean the "Form ACP-7" asbestos project notification form as approved by DEP. Asbestos investigator.

"Asbestos investigator" shall mean an individual certified by the Commissioner as having satisfactorily demonstrated his or her ability to identify the presence and evaluate the condition of asbestos in a building or structure. Asbestos project. "Asbestos project" shall mean any form of work performed in a building or structure or in connection with the replacement or repair of equipment, pipes, or electrical equipment not located in a building or structure which will disturb (e.g., remove, enclose, encapsulate) more than 25 linear feet or more than 10 square feet of asbestos-containing material. ASTM. "ASTM" shall mean the American Society For Testing and Materials. Authorized Asbestos Abatement Contractors visitor.

"Authorized visitor" shall mean the building owner and his/her representative, and any representative of a regulatory or other agency having jurisdiction over the project. Building owner. "Building owner" shall mean the person in whom legal title to the premises is vested unless the premises are held in land trust, Asbestos Abatement Contractors in which instance building owner means the person in whom beneficial title is vested. Building materials. "Building materials" shall mean any and all materials listed as Presumed Asbestos Containing Materials (PACM) and Suspect Miscellaneous ACM in NYSDOL ICR 56, including but not limited to interior and exterior finishes, equipment, plaster, roofing, flooring, caulking, sealants, tiles, insulation, and mortar and refractory bricks used in the construction of boilers.

Certified industrial hygienist. "Certified industrial hygienist" (CIH) shall mean an individual who is currently certified by] the American Board of Industrial Hygiene. Certified safety professional (CSP). "Certified safety professional" (CSP) shall mean an individual having a bachelor’s degree from an accredited college or university and a minimum of four years experience as a safety professional and who has successfully completed both levels of the Asbestos Abatement Contractors examination administered by the Board of Certified Safety Professionals and who is currently certified by that Board.

How To Clean Water Damaged Electronic Circuits

Crystals shall be swept synthetic quartz, meeting the infrared quality requirements of grade A or B of Synthetic Quartz Crystal  Specifications and Guide to the Use, IEC 60758 (1993-04), International Electrotechnical Commission, Geneva, Switzerland. Crystals shall be mounted with at least a th  read more..

Effects Of Smoke On Electronic Equipment

In the United States, flammability requirements for electrical equipment are most commonly specified in the National Electrical Code (NEC) [12]. Specific testing requirements are then defined by testing laboratory standards (e.g., Underwriters Laboratories, Canadian Standards Association, etc.). Suc  read more..

Storm Damage Building Demolition Removal Cost

Local governments manage the debris collection process. They can either perform debris collection work with local employees or use debris collection contractors.If contractors are used, their work and charges should be monitored to ensure the contract costs are eligible for FEMA funding and [ME  read more..

Determine The Size For A Dehumidifier

Reverse osmosis, alternatively, is based on membrane technology. Using a high-pressure pump, seawater is forced to flow through a membrane. The membrane only allows freshwater to pass while filtering out the dissolved minerals. Freshwater is produced as a result of this filtering with any previously  read more..

How To Clean Smoke Damage From Walls And Fixtures

The total amount of a given species released by a fire is thus dependent on the fuel consumed.This is most typically specified as a user input based on a combination of the burning object's heat release rate, mass loss rate, and heat of combustion (Hc) related as ܳ. The discussion above is ess  read more..

Storm Damage

When a storm has moved into an area, whether it's a tornado or hurricane and creates Document restoration Storm Damage to a library, a school or a business that have an extensive amount of document material, and this material has sustained a significant amount of damage it will need to be restored. There is a certain proc  read more..

Crime Scene Clean Up Technician Training

Evidence recovery and interpretation at the crime scene is the essential first step in forensic investigations. Several organizational approaches to crime scene investigation and subsequent forensic laboratory activity exist,  Crime Scene Cleanup Crime Scene Clean Up Technician Training  sometimes involving a large number of personnel with vari  read more..

Do it Yourself Wet Basement Repair

The height of your levee or floodwall will be determined partly by the Flood Protection Elevation (FPE) you have chosen. However (as explained in Chapter 3) height limitations imposed by design complexity, construction cost, and property space requirements, Basement Drying Do it Yourself Wet Basement Repair coupled with the need to provide  read more..

How To Remove Ice Storm Damage Debris In An Emerge

A monitor (usually located in a monitoring observation tower at the debris management site) assesses what percentage of the truck's volume is full of debris. This percentage is then multiplied by the truck's declared maximum volume (as previously certified and announced on a placard on the side of t  read more..

Animal Damage

Skunks are very well-known, nocturnal residents of most of the country. The common striped skunk, is characterized by prominent, lateral white stripes that run all the way down its back. Otherwise, the skunk’s fur is jet black, the body of the adult striped skunk is about the same size o  read more..