Lead Paint Removal >> Lead Paint Exposure To Workers In California

Occupational Safety and Health Administration (OSHA) Welding Safety Orders for hot work on painted steel structures require that lead-based paint be stripped back "a sufficient distance from the area to be heated to ensure that the temperature of the unstripped metal will not be appreciably raised." 
For enclosed spaces, this distance must be at least four inches from the weld or cut line, or Lead Paint Exposure To Workers In California workers must wear supplied-air respirators. 

(1) The somewhat stricter Cal/OSHA Construction Safety Order requires that all surfaces covered with toxic preservatives be stripped at least four inches from the weld or cut line (no mention of enclosed spaces), or Lead Paint Exposure To Workers In California workers must wear supplied- air respirators. The (2) The California Department of Health Services (DHS) Occupational Lead Poisoning Prevention Program received anecdotal evidence that iron workers performing hot work on previously stripped steel may encounter high airborne lead levels. These exposures may be caused by a failure to meet the four-inch- minimum OSHA requirement, Lead Paint Exposure To Workers In California or by hot work so intense that excessive lead fumes are created even when the paint is stripped back. 

The lead source may be residual paint on the surface or possibly lead in the base steel. To investigate this issue, DHS industrial hygienists conducted air sampling of an iron worker's exposure to lead fumes during two days of hot cutting 3/4-inch steel for a major seismic retrofit job on a bridge. The general contractor had Lead Paint Exposure To Workers In California purportedly stripped the lead- based coating back four inches from both sides of the cut lines prior to cutting. 

Background Very few task-based exposure assessments of iron workers engaged in the hot cutting of painted steel exist. A 1988 Canadian study of a demolition project that included the oxy-acetylene torching of an old water purification system Lead Paint Exposure To Workers In California demonstrated that sandblasting a six- to eight-inch strip from the painted metal prior to cutting significantly reduced breathing zone air levels from a mean of 21,330 ¹g/M3 to mean values of 1300 ¹g/M3 and 1100 ¹g/M3 . 

(3) A recent task-based exposure assessment evaluated oxy-acetylene torch cutting on stripped steel associated with a bridge renovation project and Lead Paint Exposure To Workers In California with an elevator demolition project. The study explored the practical technical and management problems of completing paint removal prior to torch cutting.

(4) Methods In November 1998, Lead Paint Exposure To Workers In California DHS industrial hygienists conducted two consecutive days of task-based personal exposure monitoring of an iron worker cutting 3/4-inch steel on the western span of the San Francisco-Oakland Bay Bridge. The Bay Bridge was constructed in 1936, and the existing paint is known to contain high levels (approximately 20–40%) of lead.

(5) The work consisted of hot cutting 40 one-inch by 24-inch segments from existing painted 3/4-inch steel forms (Figure 1). These steel forms were being trimmed to accommodate installation of additional outer steel braces for Lead Paint Exposure To Workers In California earthquake retrofit. The iron worker used a Lincoln Arc Iron worker CIV-25 with carbon arc electrode rods (Copper clad Arcair) on the first day, and an oxygen/propane torch on the second day. 

Actual hot-cutting time consisted of 166 minutes on day one, and 154 minutes on day two. For the eight- hour time-weighted average (TWA) calculation, Lead Paint Exposure To Workers In California zero exposure was assumed for the remainder of each shift. The paint had been stripped back from the cut line by the general contractor previously using open sandblasting. 

A tape measure was used to record the actual distance that the paint had been stripped back from each of 12 cut lines, Lead Paint Exposure To Workers In California on both front and back surfaces. Direct readings of lead levels on both stripped and unstripped steel were taken using a Niton XL-309 X-ray fluorescence (XRF) analyzer. A bulk sample of the paint was collected and analyzed. 

Personal samples in the operator breathing zone inside the welding helmet were taken on both days. On day two, Lead Paint Exposure To Workers In California separate filter samples were collected for (1) exposure when cutting on stripped steel (91 minutes) and (2) exposure when making five corner cuts on steel that had not been stripped of paint (63 minutes). 

A laboratory accredited by the National Lead Laboratory Accreditation Program performed the analyses, using Environmental Protection Agency method #SW-846 for analysis of metal in paint chip samples, Lead Paint Exposure To Workers In California and NIOSH method #7300 for analysis of airborne lead particulates. Results Content of Lead and Other Metals in the Paint Laboratory analysis of the bulk paint chip showed 4.2 percent lead by weight in the bridge paint at this location. 

This result is much lower than the 20 to 40 per- cent levels of lead typically found in bulk samples taken on San Francisco Bay Area bridges of this era. Analysis for three other metals showed 1900 ppm (0.19%) chromium, <50 ppm arsenic, Lead Paint Exposure To Workers In California and <2 ppm cadmium. At the work site, XRF analyzer readings confirmed a positive reading for lead (mean of 52 mg/cm2 for 28 readings of unstripped areas). 

The depth indicator on the XRF demonstrated that the lead was concentrated in the deepest, Lead Paint Exposure To Workers In California bright- orange layers. The Niton XRF Spectraview L-shell spectrum was analyzed to determine whether other elements were presentin the paint. The model used gave qualitative, but not quantitative, results for metals other than lead.

The spectrum proved that iron and zinc were both present above the detectable limit (DL) of 500 ppm. Furthermore, it indicated that the following elements that are often found in paint were not present above the DL of 500 ppm: arsenic, chromium, manganese, and nickel; and mercury was not present above the DL of 100 ppm. 

However, the Niton XRF was unable to provide information about cadmium or beryllium, Lead Paint Exposure To Workers In California as these elements were not detectable due to interference by the XRF's cadmium source. Stripping XRF readings revealed no detectable levels of lead (detection level of 0.05 mg/ cm2 ) on the steel that had been stripped (mean of <0.07 § 0.02 mg/cm2 for 23 readings of stripped areas). These low readings indicate that the stripping method, open abrasive blasting, was effective in removing paint.

How To Write A Renter To Cleanup A Rental

Provide and maintain receptacles to remove trash, and pay for its frequent removal.-A lease for a single-family rental property may require a tenant to provide and maintain their own receptacles, and to pay for trash collection service if it is not located in a County collection district Tenant Move Out Cleanup How To Write A Renter To Cleanup A Rental&n  read more..

How To Treat Water Damaged Carpet

Science Plan identifies specific scientific and technical programmatic issues of current importance to Ohio and the Nation. An examination of those issues yielded a set of five major focus areas with associated science goals and strategies that the Ohio Water Science Center will emphasize in its&nbs  read more..

House Mold

Remediate moisture and house mold problems Fix moisture problem, implement repair plan and/or maintenance plan Dry wet, non- Mold Remediation House Mold materials within 48 hours to prevent house mold growth Clean and dry house mold materials Discard house moldy porous items that can't be cleaned Questions to Consider  read more..

Clean Up After Fire Damage

During disasters, there are many community volunteers, who emerge with a lot of enthusiasm,some expertise, Fire Damage Clean Up After Fire Damage  and some tools appropriate to the fire tasks at hand but no connection to any organized planned response group. Unified Command's fire challenge is to marshal these spontan  read more..

Grants For Ice Storm Tree Removal

Determine Management Options and Goals
Any disaster debris management plan should include a disposal strategy. Communities need to set priorities for recycling wastes and determine the desired disposal options for the remaining waste. Segregate Hazardous Waste - Be prepared to [M  read more..

Carpet Steam Cleaning Tips

Run the system fans continuously to encourage air movement throughout the facility and in rooms housing wet materials All wet carpeting and furniture should be removed from areas where materials are airdrying and/or being packed for drying offsite.. Use of fans and dehumidifiers Water-soaked mater  read more..

Physical Symptoms Of A Meth Lab In Your Apartment

CLEANUP PROCEDURES FOR SOIL, GROUNDWATER AND SURFACEWATER
If areas of soil, surface water or groundwater contamination Meth Lab Cleanup Physical Symptoms Of A Meth Lab In Your Apartment are present, characterizationand cleanup of these areas should be conducted by a professional environmentalcontractor, in consultation with the CT Department  read more..

How To Write To A Renter To Clean Up A Rental

Thermostat Settings.During spring/summer season (May - September) the thermostat should be set on"cool/auto" at 80 degrees. During the heating season (October - April) the thermostat should be set on "heat/ auto" at 65 degrees. All electrical circuit breakers should be left "on" at move-out. Du  read more..

The Hazards Of Dealing With Lead Paint

Lead accumulates in the body following exposure. Lead stays in the blood for several months, and it can be stored in the bone for many decades. Lead poisoning (plumbism) usually results from many small exposures over a period of weeks or years. The brain and nervous system are particularly Lead Paint Removal The Hazards Of Dealing With Lead Paint  read more..

How To Remove Smoke Odor

Identification and Preparation of Cleaner Air Shelters for Protection of the Public from Wildfire Smoke 1. Identify one or more facilities with tight-sealing windows and doors and public access (for example, public schools, fire stations, or hospitals). As a rule of thumb, Smoke Damage How To Remove Smoke Odor newer build  read more..