This section applies to all occupational exposure to lead, except as provided in paragraph (a)(2). (2) This section does not apply to the construction industry or to agricultural operations. (b) Definitions. Action Level. Employee exposure, without regard to the use of respirators, to airborne lead at an 8-hour time-weighted average Occupational Exposure To Lead concentration of 30 micrograms per cubic meter of air (30 µg/m3 ). 

Chief. The Chief of the Division of Occupational Safety and Health, P.O. Box 420603, San Francisco, California 94142. Director. The Director, National Institute for Occupational Safety and Health (NIOSH), U.S. Department of Health and Human Services, or Occupational Exposure To Lead designee. Lead. Metallic lead, all inorganic lead compounds, and organic lead soaps. 

Excluded from this definition are all other organic lead compounds. (c) Permissible Exposure Limit (PEL). (1) The Occupational Exposure To Lead employer shall assure that no employee is exposed to lead at an 8-hour time-weighted average concentration greater than 50 micrograms per cubic meter of air (50 µg/m3 ). 

(2) If an Occupational Exposure To Lead employee is exposed to lead for more than 8 hours in any work day, the permissible exposure limit for that day, as a time-weighted average concentration (TWA), shall be reduced according to the following formula: Maximum permissible limit (in µg/m3 ) = 400 hours worked in the day. 

(3) When respirators are used to supplement engineering and work practice controls to comply with the PEL, employee exposure, Occupational Exposure To Lead for the purpose of determining whether the employer has complied with the PEL, may be considered to be at the level provided by the protection factor of the respirator for those periods the respirator is worn. 

Those periods may be averaged with exposure levels during periods when respirators are not worn to determine the Occupational Exposure To Lead employee's daily TWA exposure. (d) Exposure Monitoring. (1) General. (A) For the purposes of subsection (d), employee exposure is that exposure which would occur if the employee were not using a respirator. 

(B) With the exception of monitoring under Section 5198(d)(3), the Occupational Exposure To Lead employer shall collect full shift (for at least 7 continuous hours) personal samples including at least one sample for each shift for each job classification in each work area. (C) Full shift personal samples shall be representative of the monitored employee's regular, daily exposure to lead. 

(2) Initial Determination. Each employer who has a workplace or work operation covered by this standard shall determine if any employee may be exposed to lead at or Occupational Exposure To Lead above the action level. (3) Basis of Initial Determination. (A) The employer shall monitor employee exposures and shall base initial determinations on the employee exposure monitoring results and any of the following, relevant considerations: 

1. Any Occupational Exposure To Lead information, observations, or calculations which would indicate employee exposure to lead; 2. Any previous measurements of airborne lead; and 3. Any employee complaints of symptoms which may be attributable to exposure to lead. 

(B) Monitoring for the initial determination may be limited to a representative sample of the exposed Occupational Exposure To Lead employees who the employer reasonably believes are exposed to the greatest concentrations of airborne lead in the workplace. (C) Measurements of airborne lead made in the preceding 12 months may be used to satisfy the requirement to monitor under Section 5198(d)(3)(A) if sampling and analytical methods used meet the accuracy and confidence levels of Section 5198(d)(9). 

(4) Positive Initial Determination and Initial Monitoring. (A) Where a determination conducted under Section 5198(d)(2) and (d)(3) shows the possibility of any Occupational Exposure To Lead employee exposure at or above the action level, the employer shall conduct monitoring which is representative of the exposure for each employee in the workplace who is exposed to lead. 

(B) Measurements of airborne lead made in the preceding 12 months may be used to satisfy this requirement if the sampling and analytical methods used meet the accuracy and Occupational Exposure To Lead confidence levels of Section 5198(d)(9). (5) Negative Initial Determination. 

Where a determination conducted under Section 5198(d)(2) and (d)(3) is made that no employee is exposed to concentrations of airborne lead at or above the action level, the Occupational Exposure To Lead employer shall make a written record of such determination. 

The record shall include at least the information specified in Section 5198(d)(3) and shall also include the date of determination, location within the worksite, Occupational Exposure To Lead and the name and social security number of each employee monitored. 

(6) Frequency. (A) If initial monitoring reveals an employee's exposure to be above the permissible exposure limit, the Occupational Exposure To Lead employer shall repeat monitoring quarterly until at least two consecutive measurements, taken at least 7 days apart, are at or below the permissible exposure limit. Subsequent monitoring for that employee shall conform with the applicable provisions of Section 5198(d)(6)(B) or (C). 

(B) If initial monitoring or monitoring conducted in accordance with Section 5198(d)(6)(A) reveals an employee's exposure to be at or above the action level but no greater than the permissible exposure limit, Occupational Exposure To Lead the employer shall repeat monitoring at least every 6 months. 

The employer shall continue monitoring at the required frequency until at least two consecutive measurements, Occupational Exposure To Lead taken at least 7 days apart, are below the action level at which time the employer may discontinue monitoring for that employee except as otherwise provided by Section 5198(d)(7). 

(C) Whenever initial monitoring or monitoring conducted in accordance with Section 5198(d)(6)(A) reveals an employee's exposure to be below the action level, Occupational Exposure To Lead further measurements are not required except as otherwise provided by Section 5198(d)(7). 

(7) Additional Monitoring. Whenever there has been a production, process, control or personnel change which may result in new or additional exposure to lead, or whenever the employer has any other reason to suspect a change which may result in new or additional exposures to lead, Occupational Exposure To Lead additional monitoring in accordance with this subsection shall be conducted. 

(8) Employee Notification. (A) Within 5 working days after the receipt of monitoring results, the employer shall notify each employee in writing of the results which represent that employee's exposure. (B) Whenever the results indicate that the representative employee exposure, without regard to respirators, Occupational Exposure To Lead exceeds the permissible exposure limit, the employer shall include in the written notice a statement that the permissible exposure limit was exceeded and 

A description of the corrective action taken or to be taken to reduce exposure to or below the permissible exposure limit. (9) Accuracy of Measurement. The Occupational Exposure To Lead employer shall use a method of monitoring and analysis which has an accuracy (to a confidence level of 95%) within plus or minus 20 percent at concentrations of airborne lead equal to or greater than 30 µg/m3.

Smoke Damage Restoration Tips

Gandhi [98,99] performed some simple modeling of three types of gas collections systems that could be used in corrosion tests, the CNET test, the cone corrosimeter, and a third system that utilized a piston cylinder chamber. He used the mass fraction of an arbitrary corrosive component of the fire e  read more..

Mold Tester Certification

There is substantial visible mold growth inside hard surface (e.g., sheet metal) ducts or on other components of your heating and cooling system. There are several important points to understand concerning mold detection in heating and cooling systems: Many sections of your heating and cooling syste  read more..

How To Remove Toxic Smoke Damage From An Apartment

Recommendations for the Selection and Use of Respirators and Protective Clothing for Protection against Biological Agents From the National Institute for Occupational Safety and Health The approach to any potentially hazardous environment, including one with biological hazards, must be made with a p  read more..

Removing The Smoke Odor

If aerial fire retardant or firefighting foam residue is present on the house or automobiles, use a mild detergent and brushes to scrub and dilute the dried residue and flush it from the surfaces and rinse with clean water. Persons engaged in these cleaning activities may wish to wear respiratory pr  read more..

Radon Element

Note: If you are a former smoker, your risk may be higher. Lifetime risk of lung cancer deaths from EPA Assessment of Risks from Radon Mitigation Radon Element in Homes (EPA 402-R-03-003). Comparison data calculated using the Centers for Disease Control and Prevention's 1999-2001 National Center for Injury Prevention and Con  read more..

Do it Yourself Wet Basement Repair

The height of your levee or floodwall will be determined partly by the Flood Protection Elevation (FPE) you have chosen. However (as explained in Chapter 3) height limitations imposed by design complexity, construction cost, and property space requirements, Basement Drying Do it Yourself Wet Basement Repair coupled with the need to provide  read more..

Tunneling animals

You want to have the nicest lawn in the neighborhood, you want people to think that Arnold Palmer lives here. The last thing you want is some kind of animal damage, some animal rooting around in your garden or tearing up your grass. You think,” how can I stop this”, but first you s  read more..

When Is Dehumidification Required?

The main cooling coil without being re-evaporated by radiant or conducted heat. The main cooling coil must be Dehumidification When Is Dehumidification Required? selected at a coil face velocity at least 150 fpm below the maximum cataloged face velocity to ensure that moisture does not carry over onto a reheat coil (liquid water carryover o  read more..

Meth Manufacturing Labs

Once decontamination is completed, the certified contractor must perform the post-decontaminationsampling to determine compliance with the decontamination standard. It is also the responsibility of thecertified contractor to arrange for disposal of all waste materials, Meth Lab Cleanup Meth Manufacturing Labs inspect the dumpster  read more..

Carpet Cleaning Without Water

Constituents from six major chemical groups were measured: radionuclides, major and trace elements, organo chlorine pesticides and PCBs, PAHs, UWI compounds, and current-use pesticides. The results of the chemical analyses are presented in tables 2–7. Interpretations of data listed in this report a  read more..