Mechanical radon mitigation system monitors, such as manometer type pressure gauges, shall be clearly marked to indicate the range or zone of pressure readings that existed when the system was initially activated. A system description label shall be placed on the mitigation system, the electric service entrance panel, or Radon Poisoning Symptoms other prominent location. 

This label shall be legible from a distance of at least three feet and include the following information: "radon Reduction System," the installer's name, phone number, Radon Poisoning Symptoms and RCP Identification Number, the date of installation, and an advisory that the building should be tested for radon at least every two years or as required or recommended by state or local agencies. 

In addition, Radon Poisoning Symptoms all exposed and visible interior radon mitigation system vent pipe sections shall be identified with at least one label on each floor level. The label shall read, "radon Reduction System." 16 16.5 The circuit breakers controlling the circuits on which the radon vent fan and system failure warning devices operate shall be labeled "radon System." 

POST-MITIGATION TESTING 17.1 After installation of an active radon control system (e.g., SSD), the contractor shall re-examine and Radon Poisoning Symptoms verify the integrity of the fan mounting seals and all joints in the interior vent piping. 17.2 After installation of any active radon mitigation system, the contractor shall measure suctions or flows in system piping or ducting to assure that the system is operating as designed. 

When SSD systems are installed and activated, a test of pressure field extension is a good practice, particularly when there is uncertainty regarding the permeability of materials under all parts of the slab.) 17.3 Immediately after installation and Radon Poisoning Symptoms activation of any active (fan-powered) sub- slab depressurization or block wall depressurization system in buildings containing natural draft combustion appliances, the building shall be tested for backdrafting of those appliances. 

Backdrafting condition that results from installation of the radon mitigation system shall be corrected before the system is placed in operation. (Procedures and Radon Poisoning Symptoms a checklist for conducting backdrafting tests are covered in the reference documents listed in paragraphs 8.9, 8.10, and 8.11, and in paragraph 11.3.) 

Upon completion of radon mitigation work, Radon Poisoning Symptomsa test of mitigation system effectiveness shall be conducted using an RMP listed test device and in accordance with EPA testing protocols or state requirements. This test should be conducted no sooner than 24 hours nor later than 30 days following completion and activation of the mitigation system(s). 

This test may be conducted by the contractor, by the client, or by a third party testing firm. If this test is conducted by the mitigation contractor, and the test results are accepted by the client as satisfactory evidence of system effectiveness, further post-mitigation testing is not required. However, to avoid the appearance of conflict of interest, Radon Poisoning Symptoms the contractor shall recommend to the client that a mitigation system effectiveness test be conducted by an independent RMP listed or state certified testing firm or by the client. 

The contractor should request a copy of the report of any post-mitigation testing conducted by the client or by an independent testing firm. 17.5 To ensure continued effectiveness of the radon mitigation system(s) installed, Radon Poisoning Symptoms the contractor shall advise the client to retest the building at least every two years or as required or recommended by state or local authority. 

Retesting is also recommended if the building undergoes significant alteration. AND 18.0 CONTRACTS DOCUMENTATION 18.1 EPA recommends that contractors provide the following written Radon Poisoning Symptoms information to clients prior to initiation of work:

Criminal Laws For Methamphetamine Making

The following special considerations apply to site type and use: Private (e.g., apartment building) multiple dwellings require careful assessment whendetermining how much Meth Lab Cleanup Criminal Laws For Methamphetamine Making of a structure must be posted and subsequently decontaminated. This is acase by case call made by the local health depa  read more..

How To Remove Storm Damage Debris

When soliciting for debris monitoring contracts, the advertisement should outline the required qualifications of the debris monitors. The Debris Removal How To Remove Storm Damage Debris qualifications should be appropriate for the individual responsibilities and duties. Debris monitors should have experience working on construction sites and  read more..

Odor Control

An full scale epidemic of small-scale clandestine methamphetamine labs is creating a new Meth Lab Cleanup Odor Control hazard for all first responders, which includes all law enforcement officers, fire fighters, and other emergency medical workers. Meth could be made in any place and at any possible time. The stuff i  read more..

How To Stop Mold Growth In Wet Flooded Basements

perform a soils analysis similar to that performed for levee construction.
The purpose is to determine whether the soils will support the floodwall and whether seepage or migration or water through the soil will be a problem. Construction, Basement Drying How To Stop Mold Growth In Wet Flooded Basements which begins with excavation for th  read more..

Guidelines For Cleaning Up Raw Sewage

Floods can cause damage to floors, walls, rugs and personal belongings. After a flood, it is important to clean and dry affected items as quickly as possible to prevent mold growth. If flood waters contain sewage, Sewage Cleanup Guidelines For Cleaning Up Raw Sewage it is important to disinfect contaminated items and to keep yourself from coming   read more..

Trauma Scene Management Biohazard Remediation

Law enforcement officers and correctional officers may face a number of situations where there is occupational exposure to blood and other potentially infectious materials. In its publication "Guidelines for Prevention of  Crime Scene Cleanup Trauma Scene Management Biohazard Remediation Transmission of Human Immunodeficiency Virus and Hepatitis B Virus   read more..

Water Restoration

I have worked as a Crime Scene Cleanup Water Restoration technician for many years, 19 to be exact and in all of the years that I've been doing this the crime scene cleanup jobs are by far the most interesting. Some people ask me how I can handle going into a gruesome environment, dealing with some of the grossest situations   read more..

How Do I Remove Asbestos Siding In North Carolina

A set of index of refraction oils from about n = 1.350 to n = 2.000 in n = 0.005 increments. (Standard for Becke line analysis.) (j) Glass slides with painted or frosted ends 1x3 inches 1mm (thick, precleaned.) Asbestos Abatement How Do I Remove Asbestos Siding In North Carolina Cover Slips 22x22 mm, #1 1/2 (l) Paper clips or dissection needles (m) H  read more..

Dehumidification

Whether it is on a concrete slab or on piers, check to see that the building’s structure has not shifted on its foundation. Flood damaged wooden floors, if they do not warp or buckle, will sometimes push the walls outward at the base. Check for cracks in your masonry. Look near the  read more..

Prevention And Control Of Wildlife Damage

The Forest Service gives notice of and requests comment on proposed revisions to its policy on animal damage management to be published in the Forest Service Manual Chapter 2650. This Animal Damage Prevention And Control Of Wildlife Damage direction would replace current agency procedures for im  read more..