Radon Mitigation >> Radon Transform

RADON TRANSFORM MITIGATION STANDARDS 1.0 BACKGROUND The 1988 Indoor Radon transform Abatement Act (IRAA) required the Environmental Protection Agency (EPA) to develop a voluntary program to evaluate and provide information on contractors who offer radon transform Radon Transform control services to homeowners. 

The Radon transform Contractor Proficiency (RCP) Program was established to fulfill this portion of the IRAA. In December 1991, EPA published "Interim Radon transform Mitigation Standards" as initial guidelines for evaluating the Radon Transform performance of radon transform mitigation contractors under the RCP Program. 

Over the past six years, Radon Transform the effectiveness of the basic radon transform mitigation techniques set forth in the, "Interim Standards" has been validated in field applications throughout the United States. This experience now serves as the basis for the more detailed and final Radon transform Mitigation Standards (RMS) set forth in this document. 

PURPOSE The purpose of the RMS is to provide radon transform mitigation contractors with uniform standards that will ensure quality and effectiveness in the design, installation, and evaluation of radon transform mitigation systems in detached and Radon Transform attached residential buildings three stories or less in height. The RMS is intended to serve as a model set of requirements which can be adopted or modified by state and local jurisdictions to fulfill objectives of their specific radon transform contractor certification or licensure programs. 

PARTICIPANTS Minimum requirements are established in the RMS for individuals nationwide who perform radon transform remediation work and wish to participate in the RCP Program. To participate in EPA's RCP Program, Radon Transform the mitigation contractor shall have completed all RCP training and examination requirements, be listed in the current RCP Listing Report, and shall agree to follow the provisions of the RMS. 

SCOPE The Radon Transform requirements addressed in the RMS include the following categories of contractor activity: General Practices, Building Investigation, Worker Health and Safety, Systems Design, Systems Installation, Materials, Monitors and Labeling, Post-Mitigation Testing, and Contracts and Documentation. 

ASSUMPTION Before applying the provisions of the RMS, Radon Transform it is assumed that appropriate radon transform/radon transform decay product measurements have been performed within the structure, and that the owner has decided that radon transform remediation is necessary. 

IMPLEMENTATION 6.1 The RMS includes requirements for installation of radon transform remediation systems and provides a basis for evaluating the quality of those installations. It may be adopted by state regulatory agencies for state or local radon transform mitigation contractor licensure Radon Transform programs. It may also be used as a reference during inspection of in-progress or completed radon transform mitigation work. 

Contractors shall personally conduct follow-up inspection of any radon transform mitigation systems installed by their firm or Radon Transform by subcontractors to insure conformance with the requirements of the RMS. This requirement shall include the post-mitigation testing prescribed in paragraph 17.0. 6.3 EPA will evaluate reports of non- compliance with the RMS that are referred to the Agency by states and other agencies that monitor radon transform mitigation services. 

Based on its evaluation, EPA may initiate established RCP program delisting procedures against contractors that the Agency or States (with certification programs) find are in violation of the mandatory provisions of the RMS (See paragraph 6.4). In addition, Radon Transform EPA or its agent may conduct inspections of radon transform mitigation projects. 

State radon transform program personnel or Radon Transform their contracted representatives are considered EPA agents for conducting such inspections. Those provisions of the RMS that are considered to be mandatory are prefaced by the term "shall." Provisions that are considered good practice but which are not mandatory are prefaced by the terms "should" or "recommended." 

The RMS will be updated as necessary, and in response to technological advances and field experience. LIMITATIONS Although the provisions of the RMS have been carefully reviewed for potential conflicts with other regulatory requirements, Radon Transform adherence to the RMS does not guarantee compliance with the applicable codes or regulations of any other Federal, state, or local agency having jurisdiction. 

Where discrepancies exist between provisions of the RMS and local codes or regulations, local codes shall take precedence. However, Radon Transform where compliance with local codes necessitates a deviation from the RMS, EPA recommends that RCP listed contractors report the deviation in writing to the appropriate EPA Regional Office and the appropriate state regulatory official within 30 days. 

It should be noted that EPA is not requiring the reporting Radon Transform that is recommended in this paragraph. States with radon transform contractor certification programs may require that contractors give prior notification of their intent to deviate from the RMS for research or other purposes.

Problems With Plumbing Smells

Evaluation of Odors from Sewer Pipes On-Line TRS Analyzer An on-line TRS analyzer was installed at a manhole in each study site. The head space gas of each manhole was collected once every five min and was fed into the TRS analyzer. The TRS analyzer thermally oxidizes reduced sulfur compounds in a s  read more..

Compulsive Hoarding Cleanup

In this world of, “whoever dies with the most toys wins” mentality, but some people take it to a new level, it's like they lose the perspective of what's valuable and what's not. People collect all kinds of things, some collect gnomes, some collect baseball cards, but the collect   read more..

Toilet Smells Like Sewer Gas

Sanitary Sewer Odor Complaints If you have a sewer odor in your home, first look for the source in the bathrooms, kitchen or basement. Pour a gallon of water down the drains and sinks that are not used often. You can also pour a household disinfectant in all drains. If this does not solve the proble  read more..

How To Kill Mold After A Flood

Local codes generally require a building permit before yourepair or loodproof your structure. Usually you need toget a permit for electrical work, plumbing and repairs forstructural damage, such as foundations and Flood Damage How To Kill Mold After A Flood exterior walls.

Because your property may be located in a designat  read more..

How To Remove Ice Storm Damage Debris In An Emerge

A monitor (usually located in a monitoring observation tower at the debris management site) assesses what percentage of the truck's volume is full of debris. This percentage is then multiplied by the truck's declared maximum volume (as previously certified and announced on a placard on the side of t  read more..

Repair Audio Amplifiers

There are two different ways that MnO2 promotes self-healing. First, there is a thermodynamic tendency for oxygen in the dielectric to slowly diffuse into the pure tantalum substrate metal that supports it. This tendency is encouraged, exponentially, Electronic Restoration Repair Audio Amplifiers by temperature and the presence of  read more..

Grants For Ice Storm Tree Removal

Determine Management Options and Goals
Any disaster debris management plan should include a disposal strategy. Communities need to set priorities for recycling wastes and determine the desired disposal options for the remaining waste. Segregate Hazardous Waste - Be prepared to [M  read more..

Mold Remediation

The following are the minimum steps that shall be applied to all Document restoration Mold Remediation projects, and for smaller, minor restorations that could be in non-sensitive, unoccupied areas such as the flooded regions that have involved personal, single dwelling homes. This information will help you understand how a p  read more..

Colorado Flooding Causing Debris Removal

Local officials said they have had up to 90 contractors contact them in the immediate aftermath of a disaster. Some contractors travel to the disaster site and Flood Damage Colorado Flooding Causing Debris Removal repeatedly contact local officials, encouraging officials to immediately contract with their firm.

Others falsely claim  read more..

How To Read A Radon Test

COMPLY WITH EPA REQUESTS FOR INFORMATION All applicants and participants must provide EPA with information upon request. This compliance is an entrance and continuing requirement of the Radon Proficiency Program. Requests to participants, especially measurement service providers, Radon Mitigation How To Read A Radon Test may   read more..