Radon Mitigation >> Sick Building Syndrome

Psychological factors Excessive work stress or dissatisfaction, poor interpersonal relationships and poor communication are often seen to be associated with SBS. Poor and inappropriate lighting with absence of sunlight, bad acoustics, poor ergonomics Sick Building Syndrome and humidity may also contribute to SBS. 

The symptoms of SBS are commonly seen in people with clerical jobs than in people with managerial jobs because professionals or managers have better working conditions. The symptoms are more common in females than in males probably because more females are in secretarial jobs, Sick Building Syndrome they are more aware of their health or a lesser dose of pollutants is required to manifest the effects. 

The symptoms are more common in air-conditioned sick building syndromes than in naturally ventilated sick building syndromes and Sick Building Syndrome are more common in a public sector sick building syndrome than in a private sector sick building syndrome [Table 1].[8] Table 1 Types of problems found in 203 indoor air quality investigations carried out by National Institute for Occupational Safety and Hygiene 

Go to: INVESTIGATIONS Evaluating the IAQ and identifying the contaminant by air sampling. Establishing a cause and effect relationship between symptoms and Sick Building Syndrome IAQ. Identifying the cause of the complaints so that appropriate corrective measures can be initiated. Conducting a ‘walk-through’ inspection of the problems areas and collecting information on the following: 4.1. the Occupants, 4.2. 

HVAC Systems for pollution pathways Sick Building Syndrome and 4.3. Possible contamination sources.[10] The occupational health and safety resource centre at Canada's University of Western Ontario has devised a routine five-point survey for occupational hygienists to follow when investigating air quality complaints (Ruhemann 1985). 

Features include: a walk-through inspection to look for sources of contamination, such as photocopiers, insulation and cleaning materials, measurement of temperature, humidity, air movement and Sick Building Syndrome other comfort parameters, measurement of carbon dioxide to assess the ventilation efficiency, measurement of formaldehyde, carbon monoxide, ozone and respirable particles and examination of the ventilation system for causes of poor distribution, including tests for biological organisms in any water in the system.

Go to: PREVENTION AND CONTROL Increase the ventilation rates and air distribution. The heating, Sick Building Syndrome ventilation and air-conditioning systems should be designed to meet ventilation standards in the local sick building syndrome codes. The HVAC system should be operated and maintained properly to ensure that the desired ventilation rates are attained. 

If there are strong pollutants, the air may need to be directly vented to the outside. This Sick Building Syndrome method is especially recommended to remove pollutants that accumulate in specific areas such as rest rooms, copy rooms and printing facilities. The ASHRAE recommends a minimum of 8.4 air exchanges per 24 h. 

Removal or modification of the pollutant source can be carried out by a routine maintenance of HVAC systems, replacing water-stained ceiling tiles and carpets, using stone, ceramic or hardwood flooring, proper water proofing, avoiding synthetic Sick Building Syndrome or treated upholstery fabrics, minimizing the use of electronic items and unplugging idle devices, venting contaminants to the outside, storing paints, solvents, pesticides and adhesives in close containers in well-ventilated areas and using these pollutant sources in periods of low or no occupancy. 

Allowing time for sick building syndrome material in new areas to off-gas pollutants before occupancy and smoking restrictions are some measures that can be used. Air cleaning can be a useful addition to control air pollution. Air cleaning can be performed by ensuring uncongested interiors with open office designs, Sick Building Syndrome use of frosted glass and skylights that give access to natural light, terrace gardens, community spaces and indoor plants that absorb carbon monoxide and formaldehyde from the air. 

Air filters are also effective in removing some if not all of the pollutants. Education and communication are important parts of any air quality Sick Building Syndrome management programme so as to work more effectively and efficiently to prevent and solve the health problems. Legislation Banning of smoking in the workplace or restricting smoking to designated well-ventilated areas away from the work stations and creating no-smoking zones with the help of laws. 

In some European countries, Sick Building Syndrome workers have a statutory right to be involved with the employer's plans for changes in the work place. Research A field of study originating in Germany called Bau-biologie or Sick building syndrome biology has been initiated. The principles of Sick building syndrome biology are as follows:

Site status The sick building syndrome site should be geologically undisturbed. Residential areas should be away from industrial centers and main traffic routes Sick Building Syndrome and housing should have sufficient green space and should be in harmony with the surrounding environment. 

Construction concepts Natural, unadulterated and nontoxic sick building syndrome material should be used, walls, floors and ceilings should not be susceptible to mold or fungi, the basement should be waterproof and well -ventilated, the earth's natural magnetic field should not be altered or distorted, production, installation Sick Building Syndrome and disposal of sick building syndrome materials should not lead to environmental pollution, sick building syndrome activities should not lead to exploitation of nonrenewable, rate resources. 

Interiors Lighting and color must mix well with the surroundings and not jar the senses, man-made electromagnetic radiation must be reduced as much as possible, Sick Building Syndrome interiors should be done by using natural materials without toxic content and should be economically designed, there should be no toxic outgases or harsh smells, indoor humidity should be naturally regulated.

Air pollutants should be filtered and neutralized, thermal insulation should be balanced with heat retention, Sick Building Syndrome use of solar heating should be encouraged, moisture content in new sick building syndromes should be low, protective measures against noise pollution and harmful infrasonic and ultrasound radiation must be ensured, natural balance of atmospheric electricity and ion concentration should be maintained 

Martin-Gil, et al. Hospital Management International. Sterling Sick Building Syndrome Publications Limited; Outcome of research into a sick hospital. [Ref list] 4. Breiman RF, Fraser DW. 13th ed. New Jersey: Prentice Hall International Inc; 1992. Legionelloisis, Maxy-Rosenau – Last: Public Health and Preventive Medicine; pp. 181–2. [Ref list] Review Sick-building syndrome. 

Redlich CA, Sparer J, Cullen MR Lancet. 1997 Apr 5; 349(9057):1013-6. [PubMed] [Ref list] Phoon WO. Practical occupational health. Singapore: PG Publishing; 1988. pp. 326–7. [Ref list] IAQ fact sheet sick building syndrome, Sick Building Syndrome Environmental Health Center. Available from: http://www.nsc.org/ehc/indoor/sbs.htm-8k- [Ref list] 

The sick building syndrome: prevalence studies. Finnegan MJ, Pickering CA, Burge PS Br Med J (Clin Res Ed). 1984 Dec 8; 289(6458):1573-5. [PubMed] [Ref list] IAQ publications. Sick building syndrome fact sheet indoor air facts no. 4 (Revised) Available from: http://www.epa.gov/iaq/pubs/sub.html-29k- [Ref list] Sick building syndrome: Causes, effects Sick Building Syndrome and control. London: Hazards Centre; [Ref list] ‘Room in the skies’ Outlook – life wellness. 2004. Feb, pp. 26–8. [Ref list]

How To Disinfect After Sewer Problems In A Basemen

It will probably never happen at your home, but in case it does, it's important to have the facts in advance. Remember, if you experience a sewer line blockage, Sewage Cleanup How To Disinfect After Sewer Problems In A Basemen call us first. This could save the unnecessary expense of a plumber. IF AN OVERFLOW OCCURS 1. Discontinue inside water use.2  read more..

Emergency Board Up

Plywood shutters that you create yourself, if placed correctly, could provide a high degree of Wind Damage Emergency Board Up coverage from flying debris during a storm. Plywood shutters could be placed on all kinds of houses. Measure every window and every door that has glass, and add 8 inches to all the height and w  read more..

How To Remove Ice Storm Debris

A grading permit from the local government may be necessary if fill material is necessary. The soil should be placed in thin lifts and compacted per local codes and standards. This action must be decided upon before the start of the debris removal process and Debris Removal How To Remove Ice Storm Debris may not be eligible for s  read more..

Fire Damage

A fire can be devastating in the amount of damage left behind could be enormous, in some cases a home is completely destroyed and must be Debris Removal Fire Damage. It seems like in every case of fire that there is some sort of debris that must be removed and thrown away. Even in the case of a partial fire, most   read more..

How To Repair Smoke Damage From Fire

For the second time this month, Fire Damage How To Repair Smoke Damage From Fire another state joined the national movement to enhance public safety by mandating that all cigarettes sold in their state be "fire-safe.” Such cigarettes are less likely to ignite fires if dropped or carelessly discarded.

Tod  read more..

How To Get Ready For A Hurricane

Flash floods can occur within a few minutes or hours of excessive rainfall, a dam or levee failure, or a sudden release of water held by an ice jam. Flash floods often have a dangerous wall of roaring water carrying rocks, mud and other debris. Overland flooding, Emergency Board up How To Get Ready For A Hurricane the most common type   read more..

Remove The Smell Of Flood Damage From A Home

Don't sign off before the job is finished. Don't sign completion papers or Flood Damage Remove The Smell Of Flood Damage From A Home  ake the final payment until the work is completed to your satisfaction. a reputable contractor will not threaten you or pressure you to sign if the job is not finished properly. 

  read more..

Flood Water Backing Up

Steps to Responding to a Water Emergency The Water Department is dedicated to providing San Diego with a safe and reliable water supply. While the Water Operations Division and Capital Improvements Program help to maintain and improve our water system, Water Damage Flood Water Backing Up unexpected water emergencies sti  read more..

How To Remove Asbestos Siding

The following recount criterion is for a pair of counts that estimate AC in fibers/cc. The criterion is given at the type-I error level. That is, there is 5% maximum risk that we will reject a pair of counts for the reason that one might be biased, when the large Asbestos Abatement How To Remove Asbestos Siding observed differen  read more..

Do It Yourself Mold Mitigation

If abatement procedures are expected to generate a lot of dust (e.g., abrasive cleaning of contaminated surfaces, demolition of plaster walls) or the visible concentration of the mold is heavy (blanket coverage as opposed to patchy), Mold Remediation Do It Yourself Mold Mitigation it is recommended that the remediation procedures for Le  read more..