Question 1: Are we correct that Asbestos Flooring floor tile cleaning activities (normal maintenance such as stripping and buffing operations) are covered under both the Asbestos flooring General Industry Standard (§1910.1001) and the Asbestos flooring Construction Standard (§1926.1101)? 

Answer: Yes. Both standards contain the same requirements for care of Asbestos-containing flooring material. The Asbestos Flooring requirements are at 29 CFR 1910.1001(k)(7) and 29 CFR 1926.1101(l)(3). 

Question 2: Are we correct that for normal cleaning (routine stripping and buffing) that the Asbestos flooring General Industry housekeeping procedures apply, Asbestos Flooring however the Asbestos flooring Construction Standard applies when floor tile clean-up activities are performed as a result of or incidental to a Class I, II or III job? 

Are we also correct, that asbestos flooring floor tile cleaning under the Construction standard is considered a Class IV job? Answer: Stripping or buffing asbestos flooring-containing flooring material previously soiled with asbestos flooring-containing dust or Asbestos Flooring debris from a Class I, II, or III Asbestos Flooring job is not part of the clean-up activity. 

The clean-up activity consists of picking up the debris and vacuuming up the dust. As such, Asbestos Flooring stripping or buffing asbestos flooring-containing flooring material does not come under any of the designated classes of asbestos flooring work defined in the Construction Asbestos flooring Standard. 

The stripping or buffing of asbestos flooring-containing flooring material usually comes under the scope of the General Industry Asbestos flooring Standard. However, stripping or buffing of the flooring material comes under the scope of the Construction Asbestos Flooring Standard if a construction company does it as part of the completion of a construction project. 

Question 3: Both standards discuss stripping operations and [stipulate] that low abrasion pads, wet methods, and Asbestos Flooring speeds lower than 300 rpm must be employed. If higher speed machines are used and current Negative Exposure Assessment (NEA) data exists (by TEM) showing the PEL was not exceeded, is it necessary to submit a written alternative work procedure and/or seek a variance? 

Answer: The Construction Asbestos flooring Standard does not allow the use of alternative procedures Asbestos Flooring for care of asbestos flooring-containing flooring material. The Standard makes allowances for using alternative control methods for only Class I or II asbestos flooring work. 

The fact that the asbestos flooring PELs are not exceeded when the floor stripping uses low abrasion pads at speeds greater than 300 revolutions per minute (rpm) is not a sufficient condition Asbestos Flooring to warrant the receipt of a variance permitting such use. 

In order to receive a variance, Asbestos Flooring the employer must have implemented some means of maintaining asbestos flooring aerosol levels in the employees' breathing zones at levels equal to or less than the levels occurring at speeds lower than 300 rpm. Question 4: While the Construction Standard discusses submitting alternative work procedures, the General Industry Standard does not. 

How does one handle an alternative work procedure regarding the General Industry Standard? Answer: As we noted in our reply to your third question, Asbestos Flooring the Construction Asbestos flooring Standard makes allowances for alternative control methods for only Class I or II asbestos flooring work. 

Therefore, whether the stripping or buffing of asbestos flooring-containing flooring material is covered by the Construction Asbestos flooring Standard or the General Industry Asbestos Flooring Standard, Asbestos Flooring the employer who wishes to use alternative stripping or buffing procedures must seek a permanent variance.

Clean Up Water Damage Carpet

Installation shall be in accordance with an approved design and plan. Details of construction shown on the drawings but not included herein are considered as a part of this specification. Construction activities shall be in accordance with applicable OSHA regulations.SITE PREPARATION Clearing and&nb  read more..

Lead Paint Protection Requirements

Lead standard provides for a multiple physician review in cases where the employee wishes a second opinion concerning potential lead poisoning or toxicity. If an employee wishes a second opinion, he or she can make an appointment with a physician of his or her choice. This second physician will revi  read more..

Do It Yourself Flooded Basement Dehumidification

As a result, the heat released by water condensation will compensate water-evaporation provoked temperature decline and enhanced water evaporation. The total heat exchange area of 124 copper tubes in this experiment is 4.5 m2. To enhance the water productivity and heat efficiency, capillary tubing b  read more..

OCD Test

Everyone double checks things sometimes. For example, you might double check to make sure the stove or iron is turned off before leaving the house. But people with obsessive-compulsive disorder (OCD TEST) feel the need to check things repeatedly, Hoarding OCD Test or have certain thoughts or perform ro  read more..

How To Restore Vintage Paper

Proper Care and Handling of Books Taking care when handling any collection item, especially functional items like books with flexing parts, is one of the more effective, cost-efficient, Document restoration How To Restore Vintage Paper and easily achieved preservation measures.

Take proper care when handling books by: Having cl  read more..

DIV Carpet Cleaning From Floods

When drying surface, free and bound water: o Two-day duration quantity equals 50% of the day 1 total number of air moverso Three-day duration sum of air movers for day 2 and 3 equals number for day 1 When drying bound water only the number of air movers per day should remain Structural Drying DIV Carpet Cleaning From Floods the sa  read more..

How Do I Remove Asbestos Siding In North Carolina

A set of index of refraction oils from about n = 1.350 to n = 2.000 in n = 0.005 increments. (Standard for Becke line analysis.) (j) Glass slides with painted or frosted ends 1x3 inches 1mm (thick, precleaned.) Asbestos Abatement How Do I Remove Asbestos Siding In North Carolina Cover Slips 22x22 mm, #1 1/2 (l) Paper clips or dissection needles (m) H  read more..

Crime Scene Clean Up Technician Training

Evidence recovery and interpretation at the crime scene is the essential first step in forensic investigations. Several organizational approaches to crime scene investigation and subsequent forensic laboratory activity exist,  Crime Scene Cleanup Crime Scene Clean Up Technician Training  sometimes involving a large number of personnel with vari  read more..

Flood Damage House

STUDY FACTS:

Power outages were the cause of 18% of water

damage incidents involving a sump pump.

Another 40% of incidents were attributed

to things such as a clogged inlet

screen or a faulty float switch.

LOSS PREVE  read more..

Structural Drying

The reason this article is written was to provide direction in regards to the retrieval and restoration of extremely important documents and the data that might be water damaged or lost in an accident or disaster. When we say extremely important, we refer to any Document restoration Structural Drying and/or data needed f  read more..